Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.2 LAccepted-Finance 1066 67 CHHOTA BAZAR MHOW INDORE MP PIN 453441 | MHOW | INDORE | MP | 453441 | ₹88.2 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹93.5 L+₹5.2 L (5.93%)Rejected-Finance 498 GANNAUGHT ROAD MHOW MP PIN 453441 | MHOW | INDORE | MP | 453441 | ₹93.5 L+₹5.2 L (5.93%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹97.7 L+₹9.5 L (10.8%)Rejected-Finance SHOP NO 2 JANKI PLAZA BHAGWAN MAHAVIR PATH KOPARGAON AHMEDNAGAR MAHARASHTRA 423 601 | KOPARGAON | AHMEDNAGAR | MAHARASHTRA | 423601 | ₹97.7 L+₹9.5 L (10.8%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹97.7 L+₹9.5 L (10.8%)Rejected-Finance | ₹97.7 L+₹9.5 L (10.8%) | L4 | Rejected-Finance 4th Lowest |
| 5 | L5₹1.0 Cr+₹13.9 L (15.8%)Rejected-Finance | ₹1.0 Cr+₹13.9 L (15.8%) | L5 | Rejected-Finance 5th Lowest |
| Sl No | Description | Qty | Unit | M/S BABULAL SURAJMAL L1 | Vinayak Trading House L5 | M/S GARG CONSTRUCTION L2 | M/S Umashanker Mishra L4 | sunway associates L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced ) of any description & in any position not specifically provided for including dismantling of floor tiles etc complete all as specified and directed. | 57 | Cum | 100 ₹5,700 Lowest | 125 ₹7,125 | 500 ₹28,500 | 100 ₹5,700 Lowest | 135 ₹7,695 |
| 2.00 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description & in any position not specifically provided for complete all as specified and directed. | 2 | Cum | 200 ₹400 | 200 ₹400 | 500 ₹1,000 | 250 ₹500 | 135 ₹270 Lowest |
| 3.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 31.08 | Qtl | 100 ₹3,108 Lowest | 100 ₹3,108 Lowest | 100 ₹3,108 Lowest | 200 ₹6,216 | 135 ₹4,195.8 |
| 4.00 | Dismantling of stone slabs of any description or thickness in floors, approaches, dado/Partitions etc complete all as specified and as directed. | 26 | 10 Sqm | 100 ₹2,600 Lowest | 100 ₹2,600 Lowest | 100 ₹2,600 Lowest | 100 ₹2,600 Lowest | 135 ₹3,510 |
| 5.00 | Demolition of brick work or rubbled stone masonry including all quoins arches , pillars etc built in cement mortar and including removal from the site complete all as specified and as directed. | 6 | Cum | 100 ₹600 Lowest | 100 ₹600 Lowest | 400 ₹2,400 | 150 ₹900 | 135 ₹810 |
| 6.00 | Taking down chowkats or frames with shutters (without taking off shutter from frames) not exc. 1.5 sqm each, including cutting holes for removing the hold fast etc complete all as specified and as directed. Note: (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same). | 126 | Each | 100 ₹12,600 | 80 ₹10,080 | 100 ₹12,600 | 100 ₹12,600 | 63 ₹7,938 Lowest |
| 7.00 | Taking down chowkats or frames with shutters (without taking off shutter from frames) exc. 1.5 Sqm but n exc 4 Sqm each, including cutting holes for removing the hold fast etc complete all as specified and as directed. Note: (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same). | 66 | Each | 100 ₹6,600 | 80 ₹5,280 | 123 ₹8,118 | 120 ₹7,920 | 63 ₹4,158 Lowest |
| 8.00 | Taking down shutter of any description area exc 1.00 Sqm and not exc 2 Sqm each and removing from site complete all as specified and as directed. | 42 | Per Leaf | 50 ₹2,100 | 20 ₹840 Lowest | 20 ₹840 Lowest | 100 ₹4,200 | 54 ₹2,268 |
| 9.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc and including removal of debris and rubbish from the site complete all as specified and as directed. | 1,220 | Sqm | 10 ₹12,200 | 20 ₹24,400 | 25 ₹30,500 | 20 ₹24,400 | 5 ₹6,100 Lowest |
| 10.00 | Taking down steel tubing & connections including cleaning for refixing serviceable pipe or removal balance pipe of 15 mm bore complete all as specified and as directed. | 186 | RM | 10 ₹1,860 | 5 ₹930 Lowest | 10 ₹1,860 | 30 ₹5,580 | 12 ₹2,232 |
Tender Value
₹98.2 L
EMD Value
₹1.7 L
Closing Date
11 Jul 2026, 6:00 pmClosed
CWE MHOW
HQ CWE MHOW, MHOW CANTT, MHOW (M.P)-453441
SPECIAL REPAIR TO BLDG NO CB 174 CB 175 AND CB 176 OF JCOs ORs MD ACCN UNDER GE MIS MHOW
2026_MES_772116_1
CWE/MHOW/15(T) OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
HQ CWE MHOW
Please refer Tender docs
8 documents required · 8 mandatory
₹1,000
GE (M) Inf School Mhow
₹1.7 L
7 Sept 2026
13 Jun 2026
13 Jul 2026
13 Jun 2026
11 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (un-reinforced ) of any description & in any position not specifically provided for including dismantling of floor tiles etc complete all as specified and directed. | 57 | Cum | - | - |
| 2 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description & in any position not specifically provided for complete all as specified and directed. | 2 | Cum | - | - |
| 3 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 31.08 | Qtl | - | - |
| 4 | Dismantling of stone slabs of any description or thickness in floors, approaches, dado/Partitions etc complete all as specified and as directed. | 26 | 10 Sqm | - | - |
| 5 | Demolition of brick work or rubbled stone masonry including all quoins arches , pillars etc built in cement mortar and including removal from the site complete all as specified and as directed. | 6 | Cum | - | - |
| 6 | Taking down chowkats or frames with shutters (without taking off shutter from frames) not exc. 1.5 sqm each, including cutting holes for removing the hold fast etc complete all as specified and as directed. Note: (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same). | 126 | Each | - | - |
| 7 | Taking down chowkats or frames with shutters (without taking off shutter from frames) exc. 1.5 Sqm but n exc 4 Sqm each, including cutting holes for removing the hold fast etc complete all as specified and as directed. Note: (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same). | 66 | Each | - | - |
| 8 | Taking down shutter of any description area exc 1.00 Sqm and not exc 2 Sqm each and removing from site complete all as specified and as directed. | 42 | Per Leaf | - | - |
| 9 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc and including removal of debris and rubbish from the site complete all as specified and as directed. | 1,220 | Sqm | - | - |
| 10 | Taking down steel tubing & connections including cleaning for refixing serviceable pipe or removal balance pipe of 15 mm bore complete all as specified and as directed. | 186 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
PS15T.pdf
Tender Documents • 0.77 MB
SpecialCondition15T.pdf
Tender Documents • 0.22 MB
Credit15T.pdf
Tender Documents • 0.11 MB
GenralPagesAndConditions15T.pdf
Tender Documents • 0.64 MB
BOQ_864570.xls
BOQ • 7.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .