| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹1.6 CrRejected-Finance 149 PASUMAI NAGAR GUJILIYAMPARAI TK DINDIGUL 624 703 | DINDIGUL | TAMIL NADU | 624703 | ₹1.6 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | E SURESH CONTRACTOR L2 | VIHAAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Part 1: Maintanance of the Road from Ambilikkai - Kuthiluppai road to Veriyappur - Javadupatty road km 0/0-6/555 in Oddanchatram Block Of Dindigul District Estimate amount : Rs.128.52 Lakhs | |||||
| 2.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 3.00 | Km 0/0-1/0 | 46.2 | Cum | 3,977 ₹1.8 L | 3,937 ₹1.8 L |
| 4.00 | Km 1/0-2/0 | 53.57 | Cum | 3,979 ₹2.1 L | 3,949 ₹2.1 L |
| 5.00 | Km 2/0-3/0 | 55.66 | Cum | 3,999 ₹2.2 L | 3,959 ₹2.2 L |
| 6.00 | Km 3/0-4/0 | 53.48 | Cum | 3,999 ₹2.1 L | 3,969 ₹2.1 L |
| 7.00 | Km 4/0-5/0 | 54.55 | Cum | 3,999 ₹2.2 L | 3,979 ₹2.2 L |
| 8.00 | Km 5/0-6/0 | 55.73 | Cum | 3,999 ₹2.2 L | 3,989 ₹2.2 L |
| 9.00 | Km 6/0-6/555 | 31.83 | Cum | 3,999 ₹1.3 L | 3,989 ₹1.3 L |
| 10.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
30 May 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Periodic Renewal of PMGSY roads under PMGSY PERFORMANCE INCENTIVE GRANT 2024-25 including Maintenance TN05-02 Oddanchatram block of 1 No Dindigul District
2025_RDTN_141403_1
DPIR NO.2253-Tender-2025
Open Tender
Civil Works - Roads
120 days
DRDA
Periodic Renewal of PMGSY roads under PMGSY PERFORMANCE INCENTIVE GRANT 2024-25 including Maintenance TN05-02 Oddanchatram block of 1 No Dindigul District
2 documents required · 2 mandatory
₹0
₹3.1 L
DRDA,DINDIGUL
17 Dec 2025
17 May 2025
30 May 2025
17 May 2025
30 May 2025
17 May 2025
26 May 2025
Amount
Part 1: Maintanance of the Road from Ambilikkai - Kuthiluppai road to Veriyappur - Javadupatty road km 0/0-6/555 in Oddanchatram Block Of Dindigul District Estimate amount : Rs.128.52 Lakhs
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying tack coat over BT surface (not treated with primer) using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with hot Applied thermoplastic Compound with Refleateristing Glass beds on Bitumenes Surface
Provision for KM stone
Provision for HM stone
Painting and lettering of Logoboard including all materials and all labour charges etc complete
Painting and lettering of Informatory Name Board including all materials and all labour charges etc complete
Provision for Painting and lettering for Name board cum Citizen Information board including all charges etc.,complete
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
E SURESH CONTRACTOR (BID ID -618606)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid