Tender Value
₹51.0 L
EMD Value
₹51,000
Closing Date
3 Oct 2026, 3:00 pm6d left
Superintending Engineer-I, HMDA
7th floor, East Wing, Swarnajayanthi Commerical Complex, Ameerpet-500038
Providing Painting and Miscellaneous works such Brick Masonry, Plastering, Repair of Chajjas, Providing MS Ladder for Overhead tank etc for Maitrivihar Commercial Complex Building, Ameerpet
735820
HMDA/DEV/SE-I/01/03/2026-27, date 02.09.2026
OPEN
Civil Works
HYDERABAD, TELANGANA
1 document required · 1 mandatory
₹1,805
₹51,000
18 Sept 2026
18 Sept 2026
18 Sept 2026
Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.
Plastering with CM (1:6) 12mm thick including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.
Supplying and applying of Single component, elastomeric waterproof membrane coating of 2 coats to the Terrace of approved brand including cost of conveyance of all materials, lift charges, labour charges etc. including contractor profit and overhead charges but excluding seigenorage charges and GST etc. complete for finished item of work and as directed by the engineer-in-charges - For the Terrace of Maitrivihar
Painting, Priming Coat on Surface External wall of approved brand including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For V Floor
Painting, Priming Coat on Surface External wall of approved brand including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For IV Floor
Painting, Priming Coat on Surface External wall of approved brand including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For III Floor
Painting, Priming Coat on Surface External wall of approved brand including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For II Floor
Painting, Priming Coat on Surface External wall of approved brand including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For I Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For V Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For IV Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For III Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For II Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For I Floor
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For Ground floor and cellar
Painting with acrylic emulsion paint External grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/Lit. two coats to wall of approved brand and color including cost of conveyance of all materials, scaffolding, lift charges, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge - For stair case
Painting two coats with ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50grams/Lit. 1st quality (Asian make) of approved color to old iron work without primer coat including coat and conveyance of all materials to site of work, labour charges, scaffolding charges etc., complete for finished item of work and as directed by Engineer - in - Charge.
Surface preparation, removing and cleaning existing plaster and chipping from the loose particle, laitance etc., and opening cracks in V groove and cutting in V shape and filling with PU sealant etc., complete for the finished item of work as directed by the Engineer in charge, including Contarctor's profit and overhead charges, complete for finished item of work and as directed by the Engineer-in-charge
Supply of ArmStrong RoofSeal PU, single Component Polyurethane Sealant(Pour Grade) 600ml Sachet(Complies to IS: 11433-1985; ASTMC-920-87; BS-5212) , Complete for finished item of work as directed by the Engineer in charge(For the Cracks of the walls) including Contractors profit and Overhead charges but excluding Seignorage charges. Complete for finished item of work and as directed by the Engineer-in-charge.
Providing and fixing non returnable packers after drilling 14mm x 60mm in 45 degree angle for injection. Pressure grouting with 140 PSI pumps in porus area cement slurry admixed with expanding grout admixtures 200 gms per bag of cement slurry(including cement admixture, labour charges, tooles and tackles etc., ) complete for finished item of work as directed by the Engineer in charge(For the walls, Slabs and beams) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.
Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.
Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm Diameter steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work as per special Spec 1105 iincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Supply and delivery of 110 mm dia 3M single socket PVC/SWR pipe 6 kg/Sqcm including initial lead including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm including initial lead including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm complete including initial lead including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm including initial lead including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings Including initial lead including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 110 mm dia - Single Tee - UPVC/SWR Pipe fittings including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia 3M single socket PVC/SWR pipe 6 kg/Sqcm including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe- 6 Kg/sq.cm including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe- 6 Kg/sq.cm including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe- 6 Kg/sq.cm including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings - UPVC/SWR Pipe fittings including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and Delivery of 90 mm dia - Single Tee - UPVC/SWR Pipe fittings including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc. any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc. with solvent jointing as per standard practice including all incidental, labour charges, overheads and contractors profit and also loading& unloding and conveyance etc. Complete for finished item of work and as directed by Engineer in charge.
Supply and fixing of PVC accessories such Reducers 110x75 mm dia , including labour charges for fixing, solvent, nails, etc., complete for the finished item of work as directed by the Engineer in charge .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Supply and fixing of PVC accessories such as single Tee' 75mm dia including labour charges for fixing, solvent, nails, etc., complete for the finished item of work as directed by the Engineer in charge .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Supply and fixing of PVC accessories such as 75mm dia Plain Bends, including labour charges for fixing, solvent, nails, etc., complete for the finished item of work as directed by the Engineer in charge .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Supply and fixing of PVC accessories such as Elbow of 75mm dia , including labour charges for fixing, solvent, nails, etc., complete for the finished item of work as directed by the Engineer in charge .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Supply and fixing of PVC accessories such as Clamps & Nails, including labour charges for fixing, solvent, nails, etc., complete for the finished item of work as directed by the Engineer in charge .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge
Fabricating and Fixing Of Ladder using Mild steel tubular sections etc.,cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings to be supplied at the time of execution of work, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental, Labour charges for fabrication,cost of welding , power charges, cost of Labour charges for fixing Stair case in position etc. .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge At Terrace water tank Ladders
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender document.docx
TENDER_DOCUMENT • 0.19 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .