Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.6 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.8 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹14.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P GANESAN L10 | R.MANI SANKARAN L7 | A MANIMUTHU L4 | Meenakshi L6 | T THIRUPPATHI L11 | RAJESHKANNAN L8 | Prabaharan Construction L5 | SONAI GURUNATHAN L9 | THANDEESWARAN L2 | M MURUGAN L1 | P SELVAKUMAR L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work:Formation of WBM Metal road from Nedungulam main road to Mani Nagaram km0/0-0/555 in Mani Nagaram Village and Kondhagai Panchayat | ||||||||||||||
| 2.00 | Clearing and grubbing light jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 639.6 | sqm | 5.25 ₹3,357.9 | 6 ₹3,837.6 | 4.8 ₹3,070.08 | 5.09 ₹3,255.56 | 5 ₹3,198 | 5.14 ₹3,287.54 | 5.09 ₹3,255.56 | 6 ₹3,837.6 | 4 ₹2,558.4 Lowest | 5.05 ₹3,229.98 | 5.34 ₹3,415.46 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 255.84 | cum | 116.5 ₹29,805.36 | 100 ₹25,584 Lowest | 112 ₹28,654.08 | 112.29 ₹28,728.27 | 117 ₹29,933.28 | 113.4 ₹29,012.26 | 112.29 ₹28,728.27 | 120 ₹30,700.8 | 107 ₹27,374.88 | 111.59 ₹28,549.19 | 117.9 ₹30,163.54 |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | 385.09 | cum | 524.55 ₹2,01,998.96 | 400 ₹1,54,036 | 510 ₹1,96,395.9 | 506.6 ₹1,95,086.59 | 538 ₹2,07,178.42 | 511.63 ₹1,97,023.6 | 506.62 ₹1,95,094.3 | 400 ₹1,54,036 | 359 ₹1,38,247.31 Lowest | 493.9 ₹1,90,195.95 | 378 ₹1,45,564.02 |
| 5.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 299.81 | cum | 2,174.5 ₹6,51,936.85 | 2,495 ₹7,48,025.95 | 2,239.55 ₹6,71,439.49 | 2,244.4 ₹6,72,893.56 | 2,380 ₹7,13,547.8 | 2,240.25 ₹6,71,649.35 | 2,244.52 ₹6,72,929.54 | 2,400 ₹7,19,544 | 2,334.2 ₹6,99,816.5 | 1,945.76 ₹5,83,358.31 Lowest | 2,310 ₹6,92,561.1 |
| 6.00 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | 149.91 | cum | 2,559.2 ₹3,83,649.67 | 2,200 ₹3,29,802 Lowest | 2,361.9 ₹3,54,072.43 | 2,362.91 ₹3,54,223.84 | 2,500 ₹3,74,775 | 2,444.64 ₹3,66,475.98 | 2,363.04 ₹3,54,243.33 | 2,407 ₹3,60,833.37 | 2,400 ₹3,59,784 | 2,468.1 ₹3,69,992.87 | 2,409 ₹3,61,133.19 |
| 7.00 | Supply and fixing of Hecta metre stone | 2 | Nos | 219 ₹438 | 220 ₹440 | 200 ₹400 | 180.5 ₹361 | 191 ₹382 | 182.77 ₹365.54 | 103.33 ₹206.66 Lowest | 518.7 ₹1,037.4 | 520 ₹1,040 | 663 ₹1,326 | 482 ₹964 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,28,813.61 ₹2,28,813.61 | 2,27,110.6 ₹2,27,110.6 | 2,25,725.76 ₹2,25,725.76 | 2,25,818.79 ₹2,25,818.79 | 2,39,222.61 ₹2,39,222.61 | 2,28,206.57 ₹2,28,206.57 | 2,25,802.38 ₹2,25,802.38 | 2,28,598.05 ₹2,28,598.05 | 2,21,187.8 ₹2,21,187.8 | 2,11,797.41 ₹2,11,797.41 Lowest | 2,22,084.24 ₹2,22,084.24 |
Tender Value
₹18.7 L
EMD Value
₹18,730
Closing Date
7 Aug 2026, 3:00 pmClosed
Block Development officer (B.P)
Union Office Thiruppuvanam
Formation of WBM Metal Road in Maninagaram Village and Kondhagai Panchayat
2026_RDTN_688118_1
Metal Road_2627_Kondhagai
Open Tender
Civil Works
Item Rate
30 days
Union Office Thiruppuvanam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,730
Yes
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Formation of WBM Metal road from Nedungulam main road to Mani Nagaram km0/0-0/555 in Mani Nagaram Village and Kondhagai Panchayat | - | - | - | - |
| 2 | Clearing and grubbing light jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 639.6 | sqm | - | - |
| 3 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 255.84 | cum | - | - |
| 4 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | 385.09 | cum | - | - |
| 5 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 299.81 | cum | - | - |
| 6 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | 149.91 | cum | - | - |
| 7 | Supply and fixing of Hecta metre stone | 2 | Nos | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.04 MB
finance_827111.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_827111.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].