Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L Quoted ₹3.2 L | L1 | Accepted-AOC LOA issued |
| 2 | L2₹4.7 L+₹1.5 L (48.0%)Rejected-Finance UDAIPUR | BARMER | RAJASTHAN | 344001 | ₹4.7 L+₹1.5 L (48.0%) | L2 | Rejected-Finance Rejected as L2 |
| 3 | L3₹5.3 L+₹2.1 L (66.4%)Rejected-Finance GULAB CYCLE MAIN ROAD KATAINAR BANKI MONGRA KORBA 495447 | KORBA | CHHATTISGARH | 495447 | ₹5.3 L+₹2.1 L (66.4%) | L3 | Rejected-Finance Rejected as L3 |
| 4 | L4₹5.5 L+₹2.3 L (70.9%)Rejected-Finance | ₹5.5 L+₹2.3 L (70.9%) | L4 | Rejected-Finance Rejected as L4 |
| 5 | L5₹6.3 L+₹3.1 L (96.9%)Rejected-Finance 31 B HOUSING BOARD COLONY RAMPUR KOSABADI KORBA KOSABADI KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹6.3 L+₹3.1 L (96.9%) | L5 | Rejected-Finance Rejected as L5 |
Tender Value
₹11.2 L
EMD Value
₹14,000
Closing Date
16 Nov 2022, 6:00 pmClosed
Staff Officer (EnM), SECL, Korba Area
Office of the General Manager, SECL Korba Area, PO- Korba, Distt- Korba (Chhattisgarh)
Assistance work in day-to-day handling of resources to all the three mines of SRK-BLG Sub Area of Korba Area for 365 days.
2022_SECL_260991_1
SECL/KB/GM/ENM /22-23/E-Tender/54 Dt 31.10.2022
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
SRK-BLG Sub Area
Please refer Tender documents
7 documents required · 7 mandatory
₹14,000
9 May 2023
1 Nov 2022
17 Nov 2022
1 Nov 2022
16 Nov 2022
1 Nov 2022
1 Nov 2022 - 8 Nov 2022
Amount
Assistance in day to day handling of resources of all the three mines of SRK-BLG Sub Area of Korba Area for 365 days. Scope of work: 1) Loading of store material from Regional Stores, Korba and unloading of store material in SRK Main Store (Store day - 03 days in a week i.e. Monday, Wednesday and Friday) 2) Loading and unloading of received materials from SRK Main Store to Unit store of all the three mines. 3) Daily loading of safety items (Roof bolt rod- 210 nos, bearing plate 210 Nos, w/Strap plate - 90 nos) from Balgi workshop & unloading to all the three mines of SRK-BLG Sub Area. 4) Loading and unloading of collection of materials like conveyor belt structure, MS Flange, conveyor roller, conveyor drum shall etc. when as required. 5) Loading and unloading of material like M.S. plate 6/8mm, M.S. Pipe etc. from Central Stores, Korba when as required. Note: Handling of resources will be performed under the supervision of CSK / Store Clerk of SRK-BLG Sub Area.
Total impact of GST for the purpose of CTC
SHREE BALAJI ELECTRICALS
Sarvamangla Construction Company
Aditya & Ashish Constructions
SAHU INFRA PROJECTS
OHMEGA INFRASTRUCTURE AND DEVELOPERS
SUBHASH CHANDRA VISHWAKARMA
Tapan Kumar
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .