Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC Accepted Lowest rate Quoted |
| 2 | L2₹5.9 L+₹397.68 (0.07%)Rejected-AOC 2308 SF NO 453 3B1 VEERAPANDI TIRUPUR SOUTH | ₹5.9 L+₹397.68 (0.07%) | L2 | Rejected-AOC Reject Highest rate Quoted |
| Sl No | Description | Qty | Unit | Sivakumar L2 | Nareshkumar L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Bus Shelter at Dr.Ambedkar nagar in Kalakasthinathapuram Panchayat in Sembanarkoil Block MPLADP 25-26 | |||||
| 2.00 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation. | 14.5 | CUM | 264 ₹3,828 | 263 ₹3,813.5 Lowest |
| 3.00 | Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 4.07 | CUM | 2,659 ₹10,822.13 | 2,658 ₹10,818.06 Lowest |
| 4.00 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 2.72 | CUM | 6,746 ₹18,349.12 | 6,745 ₹18,346.4 Lowest |
| 5.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement | 6.31 | CUM | 10,725 ₹67,674.75 | 10,724 ₹67,668.44 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 4.56 | CUM | 10,868 ₹49,558.08 | 10,865 ₹49,544.4 Lowest |
| 7.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement | 4.9 | CUM | 6,379 ₹31,257.1 | 6,377 ₹31,247.3 Lowest |
| 8.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. | 5.61 | CUM | 6,475 ₹36,324.75 | 6,470 ₹36,296.7 Lowest |
| 9.00 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Shuttering. | 38 | SQM | 548 ₹20,824 | 547 ₹20,786 Lowest |
| 10.00 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 For bottoms. | 23.4 | SQM | 1,096 ₹25,646.4 | 1,095 ₹25,623 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
29 Jun 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.P), SEMBANARKOIL
BLOCK DEVELOPMENT OFFICER (B.P), SEMBANARKOIL
Construction of Bus Shelter at Dr.Ambedkar nagar in Kalakasthinathapuram Panchayat in Sembanarkoil Block MPLADP 25-26
2026_RDTN_679975_1
9890/2025/A2 08.06.2026
Open Tender
Civil Works
Item Rate
120 days
BLOCK DEVELOPMENT OFFICER (B.P), SEMBANARKOIL
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹6,000
Yes
BLOCK DEVELOPMENT OFFICER (B.P), SEMBANARKOIL
10 Aug 2026
9 Jun 2026
29 Jun 2026
9 Jun 2026
29 Jun 2026
10 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Bus Shelter at Dr.Ambedkar nagar in Kalakasthinathapuram Panchayat in Sembanarkoil Block MPLADP 25-26 | - | - | - | - |
| 2 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation. | 14.5 | CUM | 263.78 | ₹3,824.81 |
| 3 | Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 4.07 | CUM | 2,658.94 | ₹10,821.89 |
| 4 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 2.72 | CUM | 6,745.02 | ₹18,346.45 |
| 5 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement | 6.31 | CUM | 10,724.76 | ₹67,673.24 |
| 6 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 4.56 | CUM | 10,865.83 | ₹49,548.18 |
| 7 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement | 4.9 | CUM | 6,377.92 | ₹31,251.81 |
| 8 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. | 5.61 | CUM | 6,470.79 | ₹36,301.13 |
| 9 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Shuttering. | 38 | SQM | 547.5 | ₹20,805 |
| 10 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 For bottoms. | 23.4 | SQM | 1,095 | ₹25,623 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
SBklPriceBid.pdf
Tender Documents • 0.17 MB
SBklTechnicalBid.pdf
Tender Documents • 0.57 MB
BOQ_816992.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .