Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹87,802
Closing Date
14 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, WDSC, BAYANA
Construction of FB, PB and ECD PS Bayana Under MJSA 2-3
2026_WDSC_594845_1
NIT 06-09/2026-27/08 FB, PB amd ECD
Open Tender
Civil Works
Percentage
180 days
Bayana
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per Nit/Tender doc
₹87,802
15 Sept 2026
4 Sept 2026
15 Sept 2026
4 Sept 2026
14 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | 1:4:8 (i) 40 एमएम क्रेशर ब्रोकन पत्थर की गिटटी के स्थान पर हाथ से टूटी हुई रोडी के उपयोग करने पर वही मात्रा देय होगी परन्तु गिटटी की दर में 30 प्रतिशत की कटौती की जावेगी।(ii) Vibratar and mixure का उपयोग नहीं करने पर 3% कटौती की जावे | 20.41 | Cum | 3,753.45 | ₹76,615.42 |
| 1.02 | Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor) | 18,097.5 | Cum | 21.6 | ₹3,90,906 |
| 1.03 | Cost of seed stylohemata(L.S) | 36 | kg | 400 | ₹14,400 |
| 1.04 | Dag belling 2.5 cm to 5 cm Deep | 10,673 | Mt | 1.14 | ₹12,167.22 |
| 1.05 | Dag belling 5 to 7.5 cm deep Item No. 6 B, GKN 2026 | 2,400 | Mtr | 1.71 | ₹4,104 |
| 1.06 | Display board | 38 | no | 1,000 | ₹38,000 |
| 1.07 | Dry stone pitching using 15 to 30 cm thick dressed stone including all lift and supply of material etc. | 112.56 | Cum | 1,735.13 | ₹1,95,306.23 |
| 1.08 | Excavation including loading, unloading, disposal and dressing of excavated
earth within initial lead of 50m and lift up to 1.5m including dressing of
excavated area and dewatering wherever required complete in all respect. Hard / dense soil | 384 | Cum | 81 | ₹31,104 |
| 1.09 | Jungle clearance by scaping of grass and shrubs | 59,930 | Sqm | 2.86 | ₹1,71,399.8 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
tenderdoc.pdf
Tender Documents • 7.50 MB
BOQ_1055375.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .