Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance AT KHAS KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹6.5 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MANOJ KUMAR SINGH L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01 | Collection of old haulage rope, cutting in size & fitting with I- bolt | 60 | M.S. | 1,227.54 ₹73,652.4 |
| 2.00 | I- bolt preparation | 63 | M.S. | 1,131.01 ₹71,253.63 |
| 3.00 | I- bolt drilling & jamming, 1.5 m. length in coal (Including loading of materials at surface, unloading in u/g, carrying, drilling & jamming of I- bolts)( considering rate of roof bolting as similar nature of job) | 1,620 | Nos. | 191.02 ₹3,09,452.4 |
| 4.00 | Lowering of Cogging sleepers | 840 | Nos | 12.28 ₹10,315.2 |
| 5.00 | Loading, transporting, unloading & stacking of cogging sleepers | 840 | Nos | 12.28 ₹10,315.2 |
| 6.00 | Tightening with cogging sleepers & fitting | 60 | M.S. | 1,227.54 ₹73,652.4 |
| 13.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 98,755.42 ₹98,755.42 |
Tender Value
₹5.9 L
EMD Value
₹7,400
Closing Date
1 Aug 2025, 5:00 pmClosed
General Manager, Kajora Area
OFFICE OF THE GENERAL MANAGER KAJORA AREA PIN 713338
Side stitching of Pillars at disturb zone in R-VIIIA (Lower Kajora) seam, Pit no. 10 of Khas Kajora Colliery.
2025_ECL_339805_1
GM/KAJ/PCD/25-26/4835 Date 14.07.2025
Open Tender
Miscellaneous Works
120 days
Kajora
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,400
3 Mar 2026
18 Jul 2025
2 Aug 2025
18 Jul 2025
1 Aug 2025
18 Jul 2025
18 Jul 2025 - 23 Jul 2025
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid