| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-AOC HOUSE NO 350 NEAR VILLAGE POST OFFICE KAMASPUR SONIPAT 131021 | SONIPAT | SONIPAT | HARYANA | 131021 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹44.7 L+₹1.9 L (4.40%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹41.6 L
EMD Value
₹83,191
Closing Date
29 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BHARAT BHUSHAN
Municipal Council Bhadurgarh
Construction of street no.3 and 4 in Arya nagar and mitrau rasta in ward no.13 MC Bahadurgarh
2026_HRY_549720_1
2026D2AAE2B7 9B50 40FA B66B 5F51BD48DFDF293ULB
Open Tender
Civil Works
Works
150 days
Bahadurgarh
CC, GSB, Mastic, steel earth work etc
2 documents required · 2 mandatory
₹2,500
₹83,191
Yes
2 Nov 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
150 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.14.1]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 1. Grading I material [Through Rate] | 474.57 | cum | 1,178 | ₹5,59,043.46 |
| 2 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 4,700.75 | Sqm | 7 | ₹32,905.25 |
| 3 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | 1,680 | Metre | 160 | ₹2,68,800 |
| 4 | [26.58.2]Supply and installation of garden bench 2. Rectangular garden bench with h-shaped sides made of reinforced concrete (M30), thickness 100 mm, back height 750 mm, base width 450 mm. Back and seat shall consist of rectangular reinforced concrete planks 1500 mm x 350 mm x 50 mm. Seating height of the bench shall be 450 mm. The bench shall be fixed with nuts on concrete mount, all holes sealed after assembly and installation. All materials required to be as per BIS specifications. [Through Rate] | 20 | Each | 3,596 | ₹71,920 |
| 5 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 383.04 | cum | 202 | ₹77,374.08 |
| 6 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 190.79 | cum | 83 | ₹15,835.57 |
| 7 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] | 190.79 | cum | 138 | ₹26,329.02 |
| 8 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 383.04 | cum | 460 | ₹1,76,198.4 |
| 9 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 714.71 | cum | 3,975 | ₹28,40,972.25 |
| 10 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 20.47 | cum | 4,404 | ₹90,149.88 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_629474.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .