Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC AT PO LAIYO DIST RAMGARH JHARKHAND PIN 825325 | LAIYO | RAMGARH | JHARKHAND | 825325 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.8 L+₹8,623.44 (5.01%)Rejected-AOC KEDLA COLLIERY 3 NO MORE RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.8 L+₹12,070.22 (7.01%)Rejected-AOC KUNDA DIST BOKARO 829112 | KUNDA | BOKARO | JHARKHAND | 829112 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
26 Jul 2023, 5:00 pmClosed
Project Engineer (Excv)Jharkhand OCP
Project Engineer (Excv)Jharkhand OCP, PO-Kedla, Dist- Ramgarh, Pin- 825325
Repairing of brake, unloader valve along with replacement of hoses and wire rope and repairing of boom head, lower platform and pulley assembly of Ace 12T Crane sl. no. 6131223523 of Jharkhand OCP.
2023_CCL_283797_1
PE(X)/JOCP/NIT/23-24/25 Dated- 17.07.2023
Open Tender
Excavation Department Work
Item Rate
5 days
Jharkhand OCP
As per agreement
2 documents required · 2 mandatory
₹2,200
18 Aug 2023
17 Jul 2023
27 Jul 2023
17 Jul 2023
26 Jul 2023
17 Jul 2023
17 Jul 2023 - 21 Jul 2023
Amount
Repairing of brake and unloader valve / Replacement of hoses and cable Wire Rope replacement. (13mm X 68 meter)
Propeller shaft of pump replacement.
Replacement of clutch release bearing.
Throttle cable replacement.
Repair kit brake valve
Unloader valve combined unit.
HP Hose (1700mm X R2)
HP Hose (1500mm X R2)
HP Hose (BD X ST)
LP Hose (16070 R3)
Pulley small
Mechanic - 01 person X 03 days.
Helper - 02 person X 03 days
Repairing of Boom head, lower plateform and pulley assembly. Industrial gas set for removing of bulged material and heating of plate, sheaves, pulley etc.
Gauging electrode for making V grooves in cracked portion of head and plateform.
Suitable electrode for welding of cracked portion of counter weight and transmission guard. (Lomelt-205)
Grinding stone (size-4") for finishing of job.
Welder - 01 person X 03 days
Fitter - 01 person X 03 days
Helper - 01 person X 03 days
Total impact of GST for the purpose of CTC
Ayan Enterprises
M/s Kamrul Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_293840.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .