Loading…
Loading…
Tender Value
₹24.3 L
EMD Value
₹24,000
Closing Date
28 Sept 2026, 5:00 pm6d left
Vivek Kumar Behl
Executive Engineer, Faridabad
Construction of STP Boundary wall Police Lines, Sector- 30, Faridabad
2026_HBC_549335_1
2026898C00C9 349F 44F9 897A BB0B949855F457HHC
Open Tender
Civil Works
Works
120 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹24,000
Yes
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 242.57 | Sqm | 113 | ₹27,410.86 |
| 2 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 69.68 | Sqm | 138 | ₹9,615.43 |
| 3 | [11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [Through Rate] | 312.25 | Sqm | 59 | ₹18,422.81 |
| 4 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] | 139.36 | Sqm | 31 | ₹4,320.01 |
| 5 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 242.57 | Sqm | 88 | ₹21,346.51 |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 3,316.56 | Kg. | 83 | ₹2,75,274.48 |
| 7 | [17.73]Construction of unreinforced plain cement concrete pavement in M-25 mix design over a prepared sub base with OPC 43 grade conforming to IS:383 mixed with concrete mixer using batch type concrete mixer as per IS:1791, laid in position, compacted with needle vibrator, screed vibrator and plate vibrator, dewatering of free water with vaccum pump, finishing the surface with power floater, finishing to required lines and grades as per drawings and technical clause 1501 of MORTH specifications [Through Rate] | 61.16 | cum | 4,873 | ₹2,98,052.17 |
| 8 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 105.2 | cum | 78 | ₹8,205.29 |
| 9 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 13.15 | cum | 2,442 | ₹32,109.86 |
| 10 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 183.43 | cum | 6,113 | ₹11,21,332.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_629059.xls
BOQ • 0.34 MB
OT0162642.pdf
Other Document • 4.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .