Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-Finance | L1 | Accepted-Finance Quoted Rate | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹31.9 L
EMD Value
₹64,000
Closing Date
3 Jun 2020, 11:00 amClosed
Executive Engineer
Khaipar Banda
Construction of Boundry Wall at Police Thana Bharatkoop in Distt Chitrakoot
2020_SCIDC_469637_1
05/EE/E-Procor/Banda/20-21 Dt 12-05-20
Open Tender
Civil Works
Item Rate
60 days
EE Office UPSCIDCo Banda
Construction of Boundry Wall at Police Thana Bharatkoop in Distt Chitrakoot
2 documents required · 2 mandatory
₹1,298
UPSCIDC
₹64,000
9 Jun 2020
14 May 2020
3 Jun 2020
14 May 2020
3 Jun 2020
14 May 2020
Amount
MATERIALS Supply of PPC cement of leading manufacturer confirming to IS specification as per IS 1489 part I , 2015 company must be ACC/BIRLA/UTTAM, JP ,PRISM rate FOR site
Supply of Course Sandof approved quarry Payment will be done after 12.5% bulkage deduction
Supply of crushed stone grit of 20 mm size of approved quarry Bharatkoop/Kabrai
Supply of bricks of class-150 as per UP PWD specification
Supply of crushed stone Ballast of 40 mm size of approved quarry Bharatkoop/Kabrai or Shankargarh
Supply of Tor Steel 8 mm dia
Supply of Tor Steel 10 mm dia
Supply of Tor Steel 16 mm dia
Only Labour work with all T&P, mixture machine, vibrator,its oil,operator complete. Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Hard rock
Labour work of PCC 1:4:8 (cement:course sand:40 mm stone ballast)
R.C.C. works with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:2:4 (1cement:6aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending& binding. With 24BWG binding wire including supply of all labours, tools and plants etc required for proper completion of the works. Strength of the concrete shall not be less than M-150. in Plinth Bend GB
R.C.C. works with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:2:4 (1cement:6aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending& binding. With 24BWG binding wire including supply of all labours, tools and plants etc required for proper completion of the works. Strength of the concrete shall not be less than M-150. in Plinth Bend Colum
R.C.C. works with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:2:4 (1cement:6aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending& binding. With 24BWG binding wire including supply of all labours, tools and plants etc required for proper completion of the works. Strength of the concrete shall not be less than M-150. in Plinth Bend Top Bend
Class- 150 brick work in 1:6 cement and C.sand mortar in Super Structure including necessary scoffoldingb with its arrangement ,fixing & removing ( labour and T & P etc. )required for proper completion of work.As per PWD specification.
12/15mm wall plaster 1:6 cement :coarse sand including cost of material labour T&P etc.
M.S. tor steel Work in R.C.C. Work with cutting bending binding ans placing etc complete work including binding wire. All dia.
Hire Charges of Shutering (wooden/Steel) Fixing and removal including providing of all shuttering material (Shuttering oils, cotton waste etc) as required for proper completion of work as direction of E/I complete. Footing
Hire Charges of Shutering (wooden/Steel) Fixing and removal including providing of all shuttering material (Shuttering oils, cotton waste etc) as required for proper completion of work as direction of E/I complete. Padestal
Hire Charges of Shutering (wooden/Steel) Fixing and removal including providing of all shuttering material (Shuttering oils, cotton waste etc) as required for proper completion of work as direction of E/I complete. Column
Hire Charges of Shutering (wooden/Steel) Fixing and removal including providing of all shuttering material (Shuttering oils, cotton waste etc) as required for proper completion of work as direction of E/I complete. Beam
Shifting of materials - Bricks
Shifting of materials - Sand
Shifting of materials - Cement
Shifting of materials - 20 mm stone grit
Shifting of materials - 40 mm stone ballast
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .