Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST₹22.0 LAccepted-AOC | FIRST | Accepted-AOC BEING LOWEST | |
| 2 | SECOND₹23.9 LRejected-Finance 175 1 6TH CROSS 3RD STAGE 8TH MAIN PILLANNA GARDEN BANGALORE 560045 | BENGALURU URBAN | KARNATAKA | 560045 | SECOND | Rejected-Finance BEING NOT LOWEST | |
| 3 | THIRD₹23.9 LRejected-Finance NO 12 5TH B CROSS SHARADAMBA NAGAR M E S ROAD BANGALORE 560013 | BANGALORE | BANGALORE | KARNATAKA | 560013 | THIRD | Rejected-Finance BEING NOT LOWEST | |
| 4 | FORTH₹24.8 LRejected-Finance NO 422 CHURCH STREET NEW THIPPASANDRA BANGALORE 560075 | BANGALORE | BANGALORE | KARNATAKA | 560075 | FORTH | Rejected-Finance BEING NOT LOWEST | |
| 5 | FIFTH₹24.8 LRejected-Finance | FIFTH | Rejected-Finance BEING NOT LOWEST |
| Sl No | Description | Qty | Unit | GKR and CO L7 | Siddivinayaka Constructions L4 | Shanthi Construction L3 | PRAGATHI BUILDERS L8 | E.G.R CONSTRUCTIONS L1 | yuvan constructions L2 | PRANAVI CONSTRUCTION L5 | VARALAKSHMI CONSTRUCTIONS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for preparation of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and efflorescence salt, oil and greasy spots etc and applying one coat of white wash on wall complete all as specified and directed. | 200 | Sqm | 15 ₹3,000 | 15 ₹3,000 | 40 ₹8,000 | 17 ₹3,400 | 8 ₹1,600 Lowest | 15 ₹3,000 | 11 ₹2,200 | 15 ₹3,000 |
| 2.00 | M & L for preperation of old decorated surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, oil and greasy spots and applying one coat of white wash on ceiling surfaces complete all as specified and directed. | 100 | Sqm | 16 ₹1,600 | 15 ₹1,500 | 40 ₹4,000 | 17 ₹1,700 | 8 ₹800 Lowest | 20 ₹2,000 | 12 ₹1,200 | 15 ₹1,500 |
| 3.00 | M & L for preperation of old decorated surfaces of walls including washing, rubbing down and stopping of distempered surfaces and applying one coat of oil bound distemper complete all as specified & directed. | 7,000 | Sqm | 55 ₹3,85,000 | 52 ₹3,64,000 | 60 ₹4,20,000 | 58 ₹4,06,000 | 49 ₹3,43,000 | 48 ₹3,36,000 Lowest | 52.5 ₹3,67,500 | 50 ₹3,50,000 |
| 4.00 | M & L for Complete removal of existing treatment of wall surfaces including washing, rubbing down and stopping of distempered surfaces and applying two coat of oil bound distemper over 2 to 3mm thick wall care putty complete all as specified & directed. | 1,000 | Sqm | 85 ₹85,000 | 100 ₹1,00,000 | 105 ₹1,05,000 | 102 ₹1,02,000 | 90 ₹90,000 | 95 ₹95,000 | 85 ₹85,000 | 80 ₹80,000 Lowest |
| 5.00 | M & L Preparation of old decorated ceiling surfaces including brooming down or steel wire brushing, scarping down smoke soot, module, mass and applyng one coat of oil bound distemper on ceiling complete all as specified and as directed | 1,000 | Sqm | 58 ₹58,000 | 55 ₹55,000 | 60 ₹60,000 | 56 ₹56,000 | 49 ₹49,000 Lowest | 53 ₹53,000 | 54.5 ₹54,500 | 50 ₹50,000 |
| 6.00 | M&L for Preperation of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, trading oil and greasy spots and applying one coat of cement based paint on walls complete all as specified. | 15,500 | Sqm | 60 ₹9,30,000 | 58 ₹8,99,000 | 50 ₹7,75,000 Lowest | 62 ₹9,61,000 | 50 ₹7,75,000 Lowest | 56 ₹8,68,000 | 58.5 ₹9,06,750 | 55 ₹8,52,500 |
| 7.00 | M&L for complete removal of existing treatment of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, trading oil and gresy spots and applying two coat of cement based paint on walls over a coat of primer with alkali resistant priming paint complete all as spd and directed. | 1,000 | Sqm | 110 ₹1,10,000 | 100 ₹1,00,000 | 90 ₹90,000 | 105 ₹1,05,000 | 95 ₹95,000 | 70 ₹70,000 Lowest | 99 ₹99,000 | 100 ₹1,00,000 |
| 8.00 | Material and labour for preparation of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed | 200 | Sqm | 40 ₹8,000 Lowest | 45 ₹9,000 | 55 ₹11,000 | 52 ₹10,400 | 50 ₹10,000 | 60 ₹12,000 | 55 ₹11,000 | 55 ₹11,000 |
| 9.00 | Material and labour for prepration of old wood or wooden based surfaces or perviously treated surfaces,not otherwise described,over 10cm width or girth and applying one coat of synthetic enamel paint, complete all as specified and as directed | 600 | Sqm | 40 ₹24,000 Lowest | 50 ₹30,000 | 55 ₹33,000 | 51 ₹30,600 | 50 ₹30,000 | 70 ₹42,000 | 54 ₹32,400 | 55 ₹33,000 |
| 10.00 | M&L taking down cement plaster on brick or stone walls/ceiling of any description and in any position including raking out joints, hacking for key, scrubing down with water etc. complete all as specified and directed. | 100 | Sqm | 45 ₹4,500 | 60 ₹6,000 | 30 ₹3,000 Lowest | 64 ₹6,400 | 40 ₹4,000 | 200 ₹20,000 | 45 ₹4,500 | 70 ₹7,000 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
2 Jul 2026, 6:00 pmClosed
GE AF MARATHAHALLI
GE AF MARATHAHALLI WIND TUNNEL ROAD, KEMPAPURA, YEMALUR POST, BANGALORE. PIN- 560037
PERIODICAL SERVICES TO OTM ACCN AND SMQs VAYU VIHAR AND IAM UNDER GE (AF) MARATHAHALLI
2026_MES_771817_1
8840/E8
Open Tender
Civil Works
Item Rate
270 days
GE AF MARATHAHALLI
AS PER ENIT
7 documents required · 7 mandatory
₹500
GE AF MARATHAHALLI
₹50,000
Yes
4 Aug 2026
12 Jun 2026
8 Jul 2026
12 Jun 2026
2 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for preparation of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and efflorescence salt, oil and greasy spots etc and applying one coat of white wash on wall complete all as specified and directed. | 200 | Sqm | 1.25 | ₹250 |
| 2 | M & L for preperation of old decorated surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, oil and greasy spots and applying one coat of white wash on ceiling surfaces complete all as specified and directed. | 100 | Sqm | - | - |
| 3 | M & L for preperation of old decorated surfaces of walls including washing, rubbing down and stopping of distempered surfaces and applying one coat of oil bound distemper complete all as specified & directed. | 7,000 | Sqm | 100 | ₹7,00,000 |
| 4 | M & L for Complete removal of existing treatment of wall surfaces including washing, rubbing down and stopping of distempered surfaces and applying two coat of oil bound distemper over 2 to 3mm thick wall care putty complete all as specified & directed. | 1,000 | Sqm | 53 | ₹53,000 |
| 5 | M & L Preparation of old decorated ceiling surfaces including brooming down or steel wire brushing, scarping down smoke soot, module, mass and applyng one coat of oil bound distemper on ceiling complete all as specified and as directed | 1,000 | Sqm | 10 | ₹10,000 |
| 6 | M&L for Preperation of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, trading oil and greasy spots and applying one coat of cement based paint on walls complete all as specified. | 15,500 | Sqm | 11 | ₹1,70,500 |
| 7 | M&L for complete removal of existing treatment of old decorated wall surfaces including brooming down or steel wire brushing, scraping down smokes soot, module, moss and effloroscent salts, trading oil and gresy spots and applying two coat of cement based paint on walls over a coat of primer with alkali resistant priming paint complete all as spd and directed. | 1,000 | Sqm | 10 | ₹10,000 |
| 8 | Material and labour for preparation of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed | 200 | Sqm | 22 | ₹4,400 |
| 9 | Material and labour for prepration of old wood or wooden based surfaces or perviously treated surfaces,not otherwise described,over 10cm width or girth and applying one coat of synthetic enamel paint, complete all as specified and as directed | 600 | Sqm | - | - |
| 10 | M&L taking down cement plaster on brick or stone walls/ceiling of any description and in any position including raking out joints, hacking for key, scrubing down with water etc. complete all as specified and directed. | 100 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TENDER.pdf
Tender Documents • 0.46 MB
BOQ_864279.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .