| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance FLAT NO 203 KADIRIS APURUPA URBAN 2 ND FLOOR LAXMI NAGAR BOTANICAL GARDEN ROAD KONDAPUR HYDERABAD 500084 RANGAREDDI TELANGANA 500084 | HYDERABAD | TELANGANA | 500084 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹8.7 L (6.73%)Admitted-Finance | ₹1.4 Cr+₹8.7 L (6.73%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹30.6 L (23.6%)Admitted-Finance | ₹1.6 Cr+₹30.6 L (23.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹49.1 L (37.9%)Admitted-Finance | ₹1.8 Cr+₹49.1 L (37.9%) | L4 | Admitted-Finance |
| 5 | L5₹2.8 Cr+₹1.5 Cr (116.9%)Admitted-Finance NO 5 SWELECT HOUSE SIR SIVA SAMY SALAI MYLAPORE MYLAPORE CHENNAI TAMIL NADU 600004 | CHENNAI | TAMIL NADU | 600004 | ₹2.8 Cr+₹1.5 Cr (116.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kunamneni Technologies Private Limited L2 | RelyOn Solar Pvt. Ltd L4 | DD Project Services Private Limited L3 | SWELECT ENERGY SYSTEMS LTD L5 | JAYRAM INDUSTRIES INDIA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00SH- I: FMC of Solar Plant | ||||||||
| 1.01Monitoring, operation and Maintenance of 1500 KWp roof top Solar Photovoltaic Power Plant comprising of Solar PV modules, Junction boxes, connectors, Support systems, Power Conditioning Units (Inverters), String Monitoring Units (DCDBs), solar system DC/ AC copper cables, lightning and earthing protection arrangements, plant monitoring SCADA system, UPS, Step up Transformer (2000KVA Dry Type), HT panels, HT Power cable, weather monitoring system and water cleaning system (as per Annexure 'I' - List of Inventories) for maintaining the system for 100% serviceability (Shift - 8 Hours For One Shift + General shift as per Annexure 'II'), Monitoring, Opertaion and Maintenance for 100% Serviceability including Co-ordination with Solar Power House and Integrated Cargo Complex Substation, attending minor faults/ repairs, ensuring 100% Serviceability/ satisfactory working condition of the systems, routine and general preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/ yearly basis as per standard manufacturer's practices, Special Conditions of Contract and Technical Specifications, maintenance of records and log books and reporting as and when required, complete General Housekeeping and Upkeeping of the solar plant, Associated area and solar power evacuation substation etc., on all days including Sundays & Holidays as specified and as directed by Engineer-In-Charge as required. (Note: The quoted rate shall be exclusive of Goods and Service Tax, EPF, ESI/Mediclaim policy premium and Bonus) | ||||||||
| 1.02 | 4th Year after defect liability Period 01.08.2021 to 31.07.2022 (First Year) | 12 | Months | 3,09,000 ₹37,08,000 | 1,80,180 ₹21,62,160 | 2,60,402 ₹31,24,824 | 1,56,000 ₹18,72,000 | 1,50,000 ₹18,00,000 Lowest |
| 1.03 | 5th Year after defect liability Period 01.08.2022 to 31.07.2023 (Second Year) | 12 | Months | 3,22,463 ₹38,69,556 | 1,84,895 ₹22,18,740 | 2,73,422 ₹32,81,064 | 1,71,600 ₹20,59,200 | 1,55,000 ₹18,60,000 Lowest |
| 1.04 | 6th Year after defect liability Period 01.08.2023 to 31.07.2024 (Third Year) | 12 | Months | 3,36,759 ₹40,41,108 | 1,89,986 ₹22,79,832 | 2,87,093 ₹34,45,116 | 1,88,760 ₹22,65,120 | 1,60,000 ₹19,20,000 Lowest |
| 2.00SH- II: FMC of Solar Plant | ||||||||
| 2.01All Inclusive Comprehensive Maintenance Contract of 1500 KWp roof top Solar Photovoltaic Power Plant comprising of Junction Boxes & MC4 Connectors with DC cable of 04 sq.mm in solar panel side, Support systems, Power Conditioning Units (Inverters), String Monitoring Units (DCDBs), solar system DC/ AC copper cables, Connectors (cable side), lightning and earthing protection arrangements plant monitoring SCADA system, UPS, Step up Transformer (2000KVA Dry Type), HT panels, HT Power cable, weather monitoring system and water cleaning system (as per Annexure 'III' - List of Inventories) covering the scope of activities given in special conditions of contract and technical specifications, attending faults, carrying out supply and replacement of defective components / parts (Free of Cost) of same rating and make, ensuring serviceability / satisfactory working condition of the systems, i/c attending preventive & breakdown maintenance, Painting of PV module structure supporting concrete blocks on second year only etc. complete as specified and as directed by Engineer-In-Charge as required. (Note: Replacement of Only Solar PV Modules arises due to manufacturing defects shall be covered under Guarantee obligation and shall be replaced by the Original Solar Plant system Integrator.) | ||||||||
| 2.02 | 4th Year after defect liability Period 01.08.2021 to 31.07.2022 (First Year) | 12 | Months | 58,857 ₹7,06,284 Lowest | 2,77,250 ₹33,27,000 | 1,63,046 ₹19,56,552 | 6,75,234 ₹81,02,808 | 2,00,000 ₹24,00,000 |
| 2.03 | 5th Year after defect liability Period 01.08.2022 to 31.07.2023 (Second Year) | 12 | Months | 61,421 ₹7,37,052 Lowest | 3,20,479 ₹38,45,748 | 1,71,198 ₹20,54,376 | 5,48,300 ₹65,79,600 | 2,05,000 ₹24,60,000 |
| 2.04 | 6th Year after defect liability Period 01.08.2023 to 31.07.2024 (Third Year) | 12 | Months | 64,144 ₹7,69,728 Lowest | 3,36,000 ₹40,32,000 | 1,79,758 ₹21,57,096 | 6,02,892 ₹72,34,704 | 2,10,000 ₹25,20,000 |
Tender Value
₹1.6 Cr
Closing Date
17 Jun 2021, 5:00 pmClosed
Asst. General Manager EE
O/O Airports Authority of India, Asst. General Manager EE, Chennai Airport.
Facility Management and Comprehensive Maintenance Contract of 1.5 MWp roof top grid connected solar PV plant installed at Integrated Cargo Complex, Chennai Airport. 3 Years 01.08.2021 to 01.07.2024
2021_AAI_77354_1
AAI/CHE/AMED-VII/2021/02
Open Tender
Electrical Works
Works
1095 days
AAI, Chennai Airport
Please refer Tender documents.
22 documents required · 22 mandatory
₹1,680
Yes
Exempted
1 Jul 2021
13 May 2021
18 Jun 2021
13 May 2021
17 Jun 2021
13 May 2021
13 May 2021 - 10 Jun 2021
Amount
SH- I: FMC of Solar Plant
Monitoring, operation and Maintenance of 1500 KWp roof top Solar Photovoltaic Power Plant comprising of Solar PV modules, Junction boxes, connectors, Support systems, Power Conditioning Units (Inverters), String Monitoring Units (DCDBs), solar system DC/ AC copper cables, lightning and earthing protection arrangements, plant monitoring SCADA system, UPS, Step up Transformer (2000KVA Dry Type), HT panels, HT Power cable, weather monitoring system and water cleaning system (as per Annexure 'I' - List of Inventories) for maintaining the system for 100% serviceability (Shift - 8 Hours For One Shift + General shift as per Annexure 'II'), Monitoring, Opertaion and Maintenance for 100% Serviceability including Co-ordination with Solar Power House and Integrated Cargo Complex Substation, attending minor faults/ repairs, ensuring 100% Serviceability/ satisfactory working condition of the systems, routine and general preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/ yearly basis as per standard manufacturer's practices, Special Conditions of Contract and Technical Specifications, maintenance of records and log books and reporting as and when required, complete General Housekeeping and Upkeeping of the solar plant, Associated area and solar power evacuation substation etc., on all days including Sundays & Holidays as specified and as directed by Engineer-In-Charge as required. (Note: The quoted rate shall be exclusive of Goods and Service Tax, EPF, ESI/Mediclaim policy premium and Bonus)
4th Year after defect liability Period 01.08.2021 to 31.07.2022 (First Year)
5th Year after defect liability Period 01.08.2022 to 31.07.2023 (Second Year)
6th Year after defect liability Period 01.08.2023 to 31.07.2024 (Third Year)
SH- II: FMC of Solar Plant
All Inclusive Comprehensive Maintenance Contract of 1500 KWp roof top Solar Photovoltaic Power Plant comprising of Junction Boxes & MC4 Connectors with DC cable of 04 sq.mm in solar panel side, Support systems, Power Conditioning Units (Inverters), String Monitoring Units (DCDBs), solar system DC/ AC copper cables, Connectors (cable side), lightning and earthing protection arrangements plant monitoring SCADA system, UPS, Step up Transformer (2000KVA Dry Type), HT panels, HT Power cable, weather monitoring system and water cleaning system (as per Annexure 'III' - List of Inventories) covering the scope of activities given in special conditions of contract and technical specifications, attending faults, carrying out supply and replacement of defective components / parts (Free of Cost) of same rating and make, ensuring serviceability / satisfactory working condition of the systems, i/c attending preventive & breakdown maintenance, Painting of PV module structure supporting concrete blocks on second year only etc. complete as specified and as directed by Engineer-In-Charge as required. (Note: Replacement of Only Solar PV Modules arises due to manufacturing defects shall be covered under Guarantee obligation and shall be replaced by the Original Solar Plant system Integrator.)
4th Year after defect liability Period 01.08.2021 to 31.07.2022 (First Year)
5th Year after defect liability Period 01.08.2022 to 31.07.2023 (Second Year)
6th Year after defect liability Period 01.08.2023 to 31.07.2024 (Third Year)
Kunamneni Technologies Private Limited
DD Project Services Private Limited
RelyOn Solar Pvt. Ltd
SWELECT ENERGY SYSTEMS LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
FinalTenderDocument.pdf
Tender Documents • 11.49 MB
BOQ_83770.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .