Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Finance | -25.10% | ₹14.3 L | L1 | Admitted-Finance |
| 2 | L2₹15.6 L+₹1.3 L (8.95%)Admitted-Finance F 9 ZAKARIA AGHADI INDL ESTATE MAROL MAROSHI ROAD ANDHERI EAST MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | -18.40% | ₹15.6 L+₹1.3 L (8.95%) | L2 | Admitted-Finance |
| 3 | L3₹20.0 L+₹5.7 L (40.2%)Admitted-Finance 1 A OM SHIV CHS LTD G B ROAD MANPADA THANE MAHARASHTRA 400607 | THANE | MAHARASHTRA | 400607 | +5.00% | ₹20.0 L+₹5.7 L (40.2%) | L3 | Admitted-Finance |
| 4 | L4₹35.3 L+₹21.0 L (147.0%)Admitted-Finance | +85.00% | ₹35.3 L+₹21.0 L (147.0%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
25 May 2026, 5:00 pmClosed
Ajay B Kamble
Contract cell, Administrative Building, RCF, Mumbai-400074
As per NIT
2026_RCFL_909177_1
TROM/2610/04(01)/11/2026-PHS
Open Tender
Machineries/ Mechanical Engg Items
Works
180 days
Mumbai
As per NIT
8 documents required · 8 mandatory
₹0
Exempted
24 Jun 2026
18 May 2026
25 May 2026
18 May 2026
25 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of Pre formed pipe sections of rock wool as per SOW Clause A | 10 | M3 | 7,455 | ₹74,550 |
| 2 | Supply of LRB mattresses of rock wool of various thickness as per SOW Clause A | 75 | M3 | 7,276 | ₹5,45,700 |
| 3 | Labour cost for application of material and aluminium sheet/SS Foil /SS Band including Screws/tar felt etc. and supply of all other materials so as to complete the insulation job as per SOW Clause A | 470 | M2 | 549 | ₹2,58,030 |
| 4 | Removal & Application of all existing old insulating material inclusive of Aluminium Sheets as per SOW Clause A | 540 | M2 | 49 | ₹26,460 |
| 5 | Supply of PUF in preformed sections as per SOW Clause B | 10 | M3 | 17,907 | ₹1,79,070 |
| 6 | Supply of PUF in Slabs as per SOW Clause B | 10 | M3 | 18,266 | ₹1,82,660 |
| 7 | Labour cost for application of material /aluminium sheet/SS Foil /SS Band including Screws/tar felt etc. and supply of all other materials so as to complete the insulation job as per SOW Clause B | 85 | M2 | 576 | ₹48,960 |
| 8 | Removal & Application of all existing old insulating material inclusive of Aluminium Sheets as per SOW Clause B | 75 | M2 | 58 | ₹4,350 |
| 9 | 22 SWG SHEET (0.642 MM THICKNESS) as per SOW | 465 | M2 | 754 | ₹3,50,610 |
| 10 | 24 SWG Corrugated Sheet (0.51 MM THICKNESS) as per SOW | 30 | M2 | 897 | ₹26,910 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
BOQ_955562.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .