| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹3.4 L (3.15%)Rejected-Finance | ₹1.1 Cr+₹3.4 L (3.15%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 Cr+₹10.9 L (10.3%)Rejected-Finance | ₹1.2 Cr+₹10.9 L (10.3%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.3 Cr+₹26.9 L (25.2%)Rejected-Finance | ₹1.3 Cr+₹26.9 L (25.2%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Oct 2023, 3:00 pmClosed
Project Director, DRDA, Ramanathapuram
DRDA,Ramanathapuram
ECR to meet Thiruppullani - Kottaiyakkaranvalasai road via Thathanenthal in Thiruppullani Block
2023_RDTN_379897_3
DIPR/5562/tender/2023
Open Tender
Civil Works
Item Rate
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹1.4 L
DRDA,Ramanathapuram
30 Nov 2023
17 Oct 2023
27 Oct 2023
17 Oct 2023
27 Oct 2023
17 Oct 2023
18 Oct 2023
Amount
Strengthening the Road From ECR to meet Thiruppullani-Kottiyakkaranvalasai road(via) Thathanenthal in Thathanenthal Panchayat Km 0/0 - 2/39
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
60 cm Equilateral Traingle cautionary Sign board
Kilometre stone
Hecta metre stone
Providing and fixing of Name board for standard specification
Construction of RCC Culvert at 1.50 m Span at ch 0/020
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING M SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
Construction of RCC Culvert at 3 m Span at ch 0/400
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING M SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
Construction of RCC Culvert at 1.50 m Span at ch 2/080
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING M SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
Construction of RCC Culvert at 1.50 m Span at ch 2/110
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING M SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
Construction of RCC Culvert at 1.50 m Span at ch 2/380
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING M SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply and Fixing of Tar Paper for full width of seting of Deck slab including all labour charges etc complete..
Providing Wee pholes in brick Masonry plain reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of structure with slope of 1:20 etc complete as per specification
Gravel filling between bodywall including cost and conveyence of gravel labour for filling watering and compacting etc., completed with standard specification.,
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Sai & Co
RAJAMUTHU VELLAICHAMY
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .