| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAccepted-Finance SAPPHIRE COMPLEX 31 MUMBAI PUNE ROAD DAPODI PUNE 411012 | PUNE | PUNE | MAHARASHTRA | 411012 | ₹37.2 L | L1 | Accepted-Finance OK |
| 2 | L2₹39.1 LAccepted-Finance N 4 NS 4 PLOT NO 6 7 OPP PUNDLIK NAGAR WATER TANK AURANGABAD 431 001 | AURANGABAD | AURANGABAD | MAHARASHTRA | 431001 | ₹39.1 L | L2 | Accepted-Finance OK |
| 3 | Not Admitted-Fee/PreQual/Technical H 4 SURYA VIHAR CO OP HO SO LTD BEHIND MUNICIPAL OFFICE ADARSH ROAD KULGAON BADLAPUR E DIST THANE 421 503 | BADLAPUR | THANE | MAHARASHTRA | 421503 | - | - | Not Admitted-Fee/PreQual/Technical Others-Work Experience Certificate is not as per NIT. |
| Sl No | Description | Qty | Unit | Best Electric Corporation L1 | Tirupati Electricals Sales & Services L2 |
|---|---|---|---|---|---|
| 1.00AMC of Vertical Turbine Pumpsets and LT switchgear panel | |||||
| 1.01 | Removing the pumpset from jackwell for necessary repairs, dismantling the pumpset to ascertain the damages at factory. | 4 | Job | 30,000 ₹1.2 L | 35,000 ₹1.4 L |
| 1.02 | Supplying & erecting bowl shaft sleeve | 2 | Number | 25,000 ₹50,000 | 26,150 ₹52,300 |
| 1.03 | Supplying & erecting bowl bush | 2 | Number | 47,500 ₹95,000 | 49,215 ₹98,430 |
| 1.04 | Supplying & erecting latern Ring bronze | 2 | Number | 58,500 ₹1.2 L | 58,500 ₹1.2 L |
| 1.05 | Supplying & erecting Pump Shaft | 2 | Number | 1,12,350 ₹2.2 L | 1,17,240 ₹2.3 L |
| 1.06 | Supplying & erecting Pump Shaft Sleeve | 2 | Number | 47,550 ₹95,100 | 48,910 ₹97,820 |
| 1.07 | Supplying & erecting impeller lock collet | 2 | Number | 30,000 ₹60,000 | 31,000 ₹62,000 |
| 1.08 | Supplying & erectng Line Shaft SS410 | 4 | Number | 87,850 ₹3.5 L | 90,350 ₹3.6 L |
| 1.09 | Supplying & erecting Line Shaft Coupling SS 410 | 4 | Number | 35,250 ₹1.4 L | 37,210 ₹1.5 L |
Tender Value
₹37.5 L
EMD Value
₹37,500
Closing Date
17 Feb 2026, 11:00 amClosed
Executive Engineer MIDC E AND M
Jog Center MIDC Office 4th Floor Wakadewadi Pune
M and R to WSS at RGIBP Comprehensive AMC of Vertical Turbine Pumpsets and LT switchgear panel at Jackwell Punavale
2026_MIDC_1274211_1
4/2026
Open Tender
Electrical and Maintenance Works
HINJAWADI
AS PER NIT
3 documents required · 3 mandatory
₹10,030
₹37,500
24 Feb 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
10 Feb 2026
3 Feb 2026 - 6 Feb 2026
AMC of Vertical Turbine Pumpsets and LT switchgear panel
Removing the pumpset from jackwell for necessary repairs, dismantling the pumpset to ascertain the damages at factory.
Supplying & erecting bowl shaft sleeve
Supplying & erecting bowl bush
Supplying & erecting latern Ring bronze
Supplying & erecting Pump Shaft
Supplying & erecting Pump Shaft Sleeve
Supplying & erecting impeller lock collet
Supplying & erectng Line Shaft SS410
Supplying & erecting Line Shaft Coupling SS 410
Supplying & erecting Line shaft sleeve
Supplying & erecting Stuffing Box Bush
Supplying & erecting discharge case bearing
Supplying & erecting suction case bearing
Supplying & erecting HT Nut Bolt / Washer,teflon gland,oil paper,packing set etc complete with all consumables.
Supplying & erecting spider assembly
Supplying & erecting "O" Ring & Gasket kit
Repairs to impeller including brazing & dynamic balancing
Dismantling & removing the complete pump set with column assembly for repairs.
All shaft Straightning, truing & polishing
Assembling & erecting of the pump set at site after necessary repairs at jackwell at the designated position,testing and giving trial.
To & fro transportation charges of the pumpset from Jackwell to workshop & back including handling charges ,crane charges etc complete.
Rebate for old dismantled scrap materials
Rewinding of electric motor 350 H.P. three phase up to 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year.
Servicing and overhauling of motors, including removing from location,dismantling cleaning the winding, drying, applying, varnish, baking, changing the bearing if necessary (bearing will be supplied by MIDC) greasing the bearing,assembling, and giving satisfactory trials on No load and full load etc.
Supplying & fixing bearings of motors after removing old bearings from the motor, fitting new bearing with required tools & plants, assembling the motor & giving test & trial. a) SKF make bearing DE / 6322-C3
b) SKF make bearing NDE / 6322-C3
Supplying & fixing terminal block with necessary brass nut bolts,washers,suitable studs etc complete after removing the old damaged terminal block suitable for 350HP VHS Motor.
Annual maintenance of LT panel board & power factor correction capacitor panel of above pumps including servicing replacement of misc spare parts / worn out components etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
ItemSpecification.pdf
Tender Documents • 0.02 MB
TenderDocument.pdf
Tender Documents • 0.27 MB
BOQ_2193306.xls
BOQ • 0.35 MB