Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | ₹8.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.7 L+₹4,953.12 (0.57%)Rejected-Finance 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | ₹8.7 L+₹4,953.12 (0.57%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹8.7 L+₹11,912.04 (1.38%)Rejected-Finance AMODPUR HATTALA BIRBHUM PS SAINTHIYA BIRBHUM 731201 | SAINTHIA | BIRBHUM | WEST BENGAL | 731201 | ₹8.7 L+₹11,912.04 (1.38%) | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | SARKAR ELECTRICAL L1 | H. DEY ELECTRIC STORES L2 | M/S UTTAM KUMAR CHATTERJEE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Making canopy type LED lighting arrangement at Kapilmuni Temple, Road No-2, 3 for Maghipurnima 2026 with different coloured (Yellow/Orange/Red) LED light to be fixed by suitable G.I wire across the road with all interconnection complete for the entire mela period for 3 days | 3,600 | Chhar | 50 ₹1,80,000 Lowest | 50.5 ₹1,81,800 | 51 ₹1,83,600 |
| 2.00 | Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different places ( Phuldubi buffer Zone, Kachuberia LCT Jetty to VIP vessel Jetty, LCT Jetty, Burning Ghat and any other places as required) of road,on hire basis for 3 days (3 days x 150 fittings per day) | 450 | Pts | 163 ₹73,350 Lowest | 165 ₹74,250 | 167 ₹75,150 |
| 3.00 | Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different places ( Road No-1,2,3,4,5,6 , K1 - K2 Bus stand ) and any other places as required) of road,on hire basis for 3 days (3 days x 170 fittings per day) | 510 | Pts | 163 ₹83,130 Lowest | 165 ₹84,150 | 167 ₹85,170 |
| 4.00Supply, delivery and fitting fixing of the following at site including all electrical connection compete and running maintenance of the same during mela period including dismantling the same after mela | ||||||
| 4.01supply on hire basis and fitting fixing of 5R 200 / 300W Moving head Beam Light (Sharfy Light) – 7 Nos as per following specification:- | ||||||
| 4.02Input voltage – AC-90-240V 50/60 Hz | ||||||
| 4.03Power consumption – 300W | ||||||
| 4.04Display – LED red / blue dot matrix display or LCD display. | ||||||
| 4.05Control Protocol – DMX 512 | ||||||
| 4.06Channel – 16CH | ||||||
Tender Value
Refer Docs
EMD Value
₹17,700
Closing Date
21 Jan 2026, 9:00 amClosed
Executive Engineer SMD PHE Dte
Chetla
Street light arrangement at Road No-1,2,3,4,5,6 K1 - K2 Bus Stand and adjacent area for Maghipurnima 2026 in continuation with Ganga Sagar Mela 2026
2026_PHED_982399_5
WBPHE/EE/SMD/NIeT-57 of 2025-26
Open Tender
Electrical Work/ Equipment
Item Rate
35 days
Ganga Sagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹17,700
31 Jul 2026
9 Jan 2026
23 Jan 2026
9 Jan 2026
21 Jan 2026
9 Jan 2026
Making canopy type LED lighting arrangement at Kapilmuni Temple, Road No-2, 3 for Maghipurnima 2026 with different coloured (Yellow/Orange/Red) LED light to be fixed by suitable G.I wire across the road with all interconnection complete for the entire mela period for 3 days
Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different places ( Phuldubi buffer Zone, Kachuberia LCT Jetty to VIP vessel Jetty, LCT Jetty, Burning Ghat and any other places as required) of road,on hire basis for 3 days (3 days x 150 fittings per day)
Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different places ( Road No-1,2,3,4,5,6 , K1 - K2 Bus stand ) and any other places as required) of road,on hire basis for 3 days (3 days x 170 fittings per day)
Supply, delivery and fitting fixing of the following at site including all electrical connection compete and running maintenance of the same during mela period including dismantling the same after mela
supply on hire basis and fitting fixing of 5R 200 / 300W Moving head Beam Light (Sharfy Light) – 7 Nos as per following specification:-
Input voltage – AC-90-240V 50/60 Hz
Power consumption – 300W
Display – LED red / blue dot matrix display or LCD display.
Control Protocol – DMX 512
Channel – 16CH
Lens – 3 in 1 high precision optical lens
Horizontal scanning - 540⁰ (160 bit precision scanning) electron error correction.
Vertical Scanning - 270⁰ (16 bit precision scanning)electron error correction.
Colour Wheel – 14 colour with bidirectional function
Lamp connection – 3 pin single line input and output the power input
DMX splitter – 1 No. as per following Specification:
Voltage AC-110 / 120V, 60 Hz, 220 / 230 / 240 V 50 Hz. DMX signal isolated electrically, compatible to both 3 pin and 5 pin connectors LED indicators display output data for each channel independently.
1200 W Mooving Head (Laser) – 7 Nos. as per following specification:
2 colour wheel, 7main colour 7 mixed colour, bi-direction high speed rolling with rainbow effect both sides.
Gobo 1 has 4 types of fine glass gobas rotating 360⁰ bi-directions with turntable speed against direction.
LCD liquid crystal display can be switched in chiese and English display.
1-11 times / s ultra high speed strobe effect.
0-100% Mechanical Linear dimming can control shading to full open.
inside electronics iris with 10-100% linearly adjustable
5 rotating stand prisms
540⁰ Pans with 8 or 16 bit resution
270⁰ tilt with 8 or 16 bit resolution
Automatic pan and Tilit repositioning by photoelectric
For 4 days = 4 days x 12 sets.
DMX controlling board pilot – 2000 1No. as per following specification.
Con control up to 40 Computer Lights
Each lamp maximum number of channel – 36
Functional channel reel type designs which can simultaneously control 6 channel to moving part can be provided two kinds of control mode relative and absolute in order to obtain the best effect.
SMPTE Synchronization
Preset and memory independent time setting
40 computer lights programs running lighting lights procedures a preset and scenes can be connected with PC data transmission.
For 4 days = 4 days x 4 sets.
Guarding arrangement for the whole installation of the above items for the entire period round the clock with effect for 3 days
Carrying back departmental luminaries and accessories etc from different locations to Ganga Sagar PHE store after dismantling the luminaries, accessories, cable etc. at by hiring of car and all other necessary arrangement after completion of MaghiPurnima-2026
Add GST @ 18%
Add CESS @ 1%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_2404240.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .