| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | ₹15.6 L | L1 | Accepted-AOC Lowest amount quoated |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | B.Vinothkumar L2 | Thangavel L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Iypedu to Iypedu ADC Road km 0/0-0/50 (R-172) in Sholinghur Union in Ranipet District | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 576 | sqm | 6.26 ₹3,606 | 6 ₹3,456 |
| 3.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete | 480 | sqm | 23.3 ₹11,184 | 23 ₹11,040 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 201.6 | cum | 140.3 ₹28,284 | 140 ₹28,224 |
| 5.00 | Collection and supply of Grity gravel for Basecourse And side berms and labour charges for filling etc complete | 64.8 | cum | 146 ₹9,461 | 146 ₹9,461 |
| 6.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 216 | cum | 2,352 ₹5.1 L | 2,350 ₹5.1 L |
| 7.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 1,440 | sqm | 86 ₹1.2 L | 86.1 ₹1.2 L |
| 8.00 | Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 1,440 | sqm | 20 ₹28,800 | 20 ₹28,800 |
| 9.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 43.2 | cum | 11,139 ₹4.8 L | 11,139 ₹4.8 L |
| 10.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface | 96 | sqm | 890 ₹85,440 | 890 ₹85,440 |
Tender Value
₹15.6 L
EMD Value
₹15,830
Closing Date
19 Feb 2026, 12:00 pmClosed
President Ayepedu
President Ayepedu
Strenghthening of the road to ayepedu to ayepedu colony km 0 to 500 R 172
2026_RDTN_660933_1
A3/4818/2025
Open Tender
Civil Works
President Ayepedu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,830
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
Strengthening of the road from Iypedu to Iypedu ADC Road km 0/0-0/50 (R-172) in Sholinghur Union in Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Grity gravel for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying Tack coat over WMM surface using 2.50 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface
60 cm equilateral triangle
Provision for Hectometer stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_793179.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_793179.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid