| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹29.8 L+₹15,372.13 (0.52%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S A V CONSTRUCTIONS L1 | PERFECT ENGINEERING SERVICES L2 |
|---|---|---|---|---|---|
| 1.00Construction of RCC Retaining wall at Nalkalpalam road to Sarthar Palam (via) Thoppalankadu @ 3.178 km H/O S.Chettipatty. | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. | 270.56 | Cum | 246 ₹66,557.76 Lowest | 250 ₹67,640 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 43.88 | Cum | 5,168 ₹2,26,771.84 Lowest | 5,200 ₹2,28,176 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc.. | 306.5 | Sqm | 516 ₹1,58,154 Lowest | 520 ₹1,59,380 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works..etc…, | 7.03 | mt | 89,880 ₹6,31,766.52 Lowest | 90,000 ₹6,32,610 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 153.89 | Cum | 8,950 ₹13,77,315.5 Lowest | 9,000 ₹13,85,010 |
| 7.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 2.03 | Cum | 5,890 ₹11,956.7 Lowest | 5,900 ₹11,977 |
| 8.00 | Gravel filling between body wall inclding cost and convenyance of Gravel labour for filling watering and compacting etc.,complete complying with standard specification and as directed by the deportmental officer. | 151.29 | Cum | 275 ₹41,604.75 Lowest | 280 ₹42,361.2 |
| 9.00 | provision for Wheepholes 90mm dia PVC Pipe | 3.6 | Nos | 100 ₹360 Lowest | 100 ₹360 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 4,52,608 ₹4,52,608 Lowest | 4,54,953 ₹4,54,953 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
13 Aug 2025, 3:00 pmClosed
BDO (BP)
BDO Office Omalur
Construction of RCC Retaining wall at Nalkalpalam road to Sarthar Palam (via) Thoppalankadu at 3.178 km H/O S.Chettipatty. Panchayat Omalur Block at Salem District SFC(DP) - 2025-26
2025_RDTN_588196_2
Roc.No.2784/2025/A2
Open Tender
Civil Works
Item Wise
90 days
BDO Office Omalur
As per tender document
3 documents required · 3 mandatory
₹0
₹30,000
14 Aug 2025
2 Aug 2025
13 Aug 2025
2 Aug 2025
13 Aug 2025
2 Aug 2025
Amount
Construction of RCC Retaining wall at Nalkalpalam road to Sarthar Palam (via) Thoppalankadu @ 3.178 km H/O S.Chettipatty.
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works..etc…,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Gravel filling between body wall inclding cost and convenyance of Gravel labour for filling watering and compacting etc.,complete complying with standard specification and as directed by the deportmental officer.
provision for Wheepholes 90mm dia PVC Pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PERFECT ENGINEERING SERVICES (BID ID -1427741)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .