Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹91.9 LAdmitted-Finance | -30.79% | ₹91.9 L | L1 | Admitted-Finance |
| 2 | L2₹92.2 L+₹31,340.36 (0.34%)Admitted-Finance 25A CHAK HARINANDAN NAIN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | -30.55% | ₹92.2 L+₹31,340.36 (0.34%) | L2 | Admitted-Finance |
| 3 | L3₹93.2 L+₹1.2 L (1.35%)Admitted-Finance | -29.85% | ₹93.2 L+₹1.2 L (1.35%) | L3 | Admitted-Finance |
| 4 | L4₹96.8 L+₹4.9 L (5.33%)Admitted-Finance | -27.10% | ₹96.8 L+₹4.9 L (5.33%) | L4 | Admitted-Finance |
| 5 | L5₹97.1 L+₹5.2 L (5.64%)Admitted-Finance A 15 ASHOK PURAM COLONY HAFIZBAGH VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | -26.88% | ₹97.1 L+₹5.2 L (5.64%) | L5 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
28 May 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-07 Ward-16 Bahmalpur ke antargat Nai Basti me Shivakant Mishra ke makan se Anoop Mishra ke makan hote hue Vijay Kumar Tiwari ke makan tak aantarik galiyon me, aur Rangpura me Dara Yadav ke makan se Purushottam ke makan hote hue Vivek Pandey, Man
2026_NNAMC_1145920_8
28.05.2026 CM NSY
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,670
AS PER DOCS
₹2.7 L
16 Jul 2026
7 May 2026
28 May 2026
7 May 2026
28 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 433.2 | cum | 160 | ₹69,312 |
| 2 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) | 1,626 | cum | 87.3 | ₹1,41,949.8 |
| 3 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 FM. and cement in proportion of 12:6:1 in foundations and 3 under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST (S.I. No. 273) | 86.64 | Cum | 3,500 | ₹3,03,240 |
| 4 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 813 | cum | 1,654.8 | ₹13,45,352.4 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 305.29 | cum | 5,300 | ₹16,18,037 |
| 6 | 12mm thick plaster cement mortar consisting of 1 part cement and 4 parts of fine sand of 1.25 finerness modulus.SI 574 | 684 | Cum | 171 | ₹1,16,964 |
| 7 | Laying of 100 micron polythelene under the foundation & floor for anti saltpeter treatment i/c supply of all materials, labour T&P required for proper completion of the work New item | 5,420 | Sqm | 74.88 | ₹4,05,849.6 |
| 8 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. | 858.14 | Cum | 8,200 | ₹70,36,748 |
| 9 | Addiional for non mettalic CC surface Hrdner, etc all complete work | 5,420 | Sqm | 96.25 | ₹5,21,675 |
| 10 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 103.97 | Cum | 9,300 | ₹9,66,921 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2142629.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .