| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical As per TR and CR |
| 2 | Accepted-Technical | Accepted-Technical As per TR and CR |
| 3 | Rejected-Technical A 16 INDUSTRIAL PHASE 2 BLOCK A ROAD PHASE 2 NOIDA GAUTAM BUDDH NAGAR UTTARPRADESH GAUTAM BUDDHA NAGAR UTTAR PRADESH 201305 UDYAM UP 28 0001895 09AABCB6573H1ZI B R M MII STATUS AS VERIFIED | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201305 | Rejected-Technical As per TR and CR |
| 4 | Rejected-Technical | Rejected-Technical As per TR |
| 5 | Rejected-Technical 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | Rejected-Technical As per TR |
Tender Value
Refer Docs
Closing Date
9 Apr 2026, 1:00 pmClosed
Nitin Kumar
As per Tender Documents
Framework Agreement (Rate Contract) of ELEVATOR
2026_BHEL_59311_1
77/25/6325/NIT
Open Tender
Miscellaneous Goods
Supply
365 days
BHEL PEM Noida
As per Tender Documents
2 documents required · 2 mandatory
₹0
Exempted
Online
16 Sept 2026
13 Mar 2026
9 Apr 2026
13 Mar 2026
9 Apr 2026
13 Mar 2026
19 Mar 2026
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY PART, SERVICE PART & MANDATORY SPARES comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition complete with all accessories for Elevators.
MAJOR BREAK-UP OF PRICES GIVEN IN 1.0 ABOVE.
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (680 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (884 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Panoramic Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Goods Cum passenger Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (2000 Kg, Goods Cum passenger Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (680 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (884 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Panoramic Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Goods cum Passenger Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (2000 Kg, Goods cum Passenger Type Elevators) complete with all accessories.
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (680 Kg, Conventional Type Elevators). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (884 Kg, Conventional Type Elevators). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (1088 Kg,Conventional Type- Passenger Elevator, Goods cum passenger Elevator and Panoramic Type Elevators ). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (2000 Kg, Goods Cum passenger Elevators ). (Refer Technical Specification for Mandatory spares).
RATE CONTRACT F ELEVATOR
ELEVATOR
PE-TS-RC-502-A001
DESCRIPTION
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY PART, SERVICE PART & MANDATORY SPARES comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition complete with all accessories for Elevators.
MAJOR BREAK-UP OF PRICES GIVEN IN 1.0 ABOVE.
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (680 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (884 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Conventional Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Panoramic Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (1088 Kg, Goods Cum passenger Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lump sum firm price inclusive of all prevailing taxes, duties and other levies for SUPPLY part comprising of design (i.e. preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables, mandatory spares alongwith spares for erection, startup and commissioning as required, forwarding, proper packing, shipment and delivery at site (2000 Kg, Goods Cum passenger Type Elevators) complete with all accessories. (Break-up as per Annexure I)
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (680 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (884 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Conventional Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Panoramic Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (1088 Kg, Goods cum Passenger Type Elevators) complete with all accessories.
Total lumpsum firm prices inclusive of all prevailing taxes, duties and other levies for the Services as specified, unloading, handling, transportation & storage at site, in-site transportation, assembly, erection & commissioning, trial run at site, carrying out Functional/Demonstration tests at site, training of customer/client O&M staff & final handing over to end customer in flawless condition of Elevator (2000 Kg, Goods cum Passenger Type Elevators) complete with all accessories.
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (680 Kg, Conventional Type Elevators). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (884 Kg, Conventional Type Elevators). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (1088 Kg,Conventional Type- Passenger Elevator, Goods cum passenger Elevator and Panoramic Type Elevators ). (Refer Technical Specification for Mandatory spares).
Total lumpsum firm price inclusive of all prevailing taxes, duties and other levies for Mandatory spares comprising of manufacture, fabrication, assembly, inspection / testing at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & handing over to end customer in flawless condition for Elevator (2000 Kg, Goods Cum passenger Elevators ). (Refer Technical Specification for Mandatory spares).
Designation
RATE CONTRACT OF ELEVATOR
ELEVATOR
PE-TS-RC-502-A001
DESCRIPTION
680 Kg, Conventional Type- Passenger Elevator
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details)
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators. (Refer Technical Specification for travel details)
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.1 of Main sheet)
884 Kg, Conventional Type- Passenger Elevator
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details).
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators (Refer Technical Specification for travel details).
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.2 of Main sheet)
1088 Kg, Conventional Type- Passenger Elevator
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details).
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators. (Refer Technical Specification for travel details).
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.3 of Main sheet)
1088 Kg Panoramic Type- Passenger Elevator.
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details)
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators. (Refer Technical Specification for travel details).
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.4 of Main sheet)
1088 Kg Goods cum passenger Type Elevator
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details).
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators. (Refer Technical Specification for travel details).
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.5 of Main sheet)
2000 Kg Goods cum passenger Type Elevator.
Landing doors, landing operating panel (LOP), door fixing arrangement etc meeting total landing requirement for the elevators. (Refer Technical Specification for landing details).
Rope, Trailing cable, guide rails for car and counter weight, guide brackets, anchor fasteners, Shaft Lighting etc meeting total travel requirement for the elevators (Refer Technical Specification for travel details).
Maintenance tools and tackles.
Total (Should match with prices quoted against Sl No. 2.6 of Main sheet)
Framework Agreement (Rate Contract)
ELEVATOR
Volume/Section
TECHNICAL DEVIATION
COMMERCIAL DEVIATION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.28 MB
Tendernotice_2.pdf
PDF • 18.83 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 15.39 MB
Tendernotice_5.pdf
PDF • 12.58 MB
Tendernotice_6.pdf
PDF • 0.48 MB
Tendernotice_7.pdf
PDF • 4.11 MB
Tendernotice_8.pdf
PDF • 0.42 MB
Techspecs.rar
Tender Documents • 9.07 MB
PRICESCHEDULE.xls
Additional Documents • 0.08 MB
Corrigenda01.pdf
PDF • 2.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .