Loading…
Loading…
Tender Value
₹4.5 L
EMD Value
₹13,410
Closing Date
3 Sept 2026, 3:00 pm7d left
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
C/o sanitary Complex Jamia Masjid Gushi At Gushi-A
2026_RDPR_322469_32
NIT NO 102 OF 2026-27 ADF CDF
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹13,410
27 Aug 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
27 Aug 2026 - 27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil | 9.06 | cum | 256.85 | ₹2,327.06 |
| 2 | P/L of dry stone soling (Nallah) hand packed i/c carraige of material for an average lead of 15 kms | 0.91 | cum | 950 | ₹864.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.45 | cum | 5,202.9 | ₹2,341.31 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10.31 | cum | 7,104.35 | ₹73,245.85 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 14.13 | sqm | 286.35 | ₹4,046.13 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 17.84 | sqm | 742.55 | ₹13,247.09 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 40.08 | sqm | 577.55 | ₹23,148.2 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level of FE 500D | 1,133.91 | kg | 123.2 | ₹1,39,697.71 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 above plinth level including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 6.63 | cum | 9,027.2 | ₹59,850.34 |
| 10 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 37.3 | sqm | 266.2 | ₹9,929.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1081760.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].