Constructing RCC Gutter In Internal Village At Ambabaichiwadi Tal. Barshi Dist. Solapur
2026_SOLAP_1340599_1
01/Ambabaichiwadi/01/24-25-26
Open Tender
Civil Works
Percentage
180 days
At Ambabaichiwadi Tal. Barshi Dist. Solapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Exempted
25 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Constructing RCC Gutar in Internal Village . ITEM NO : 1 Excavation for foundation/pipe trenches in earth, soils, of all types ,sand, gravel , and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading. as directed ,normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete | 30.24 | Cum | 165 | ₹4,989.6 |
| 2 | ITEM NO : 2 Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below ,stacking and spreading as directed by Engineer-In-Charge, normal dewatering ,preparing the bed for foundation and excluding back filling, etc.complete. | 34.56 | Cum | 187 | ₹6,462.72 |
| 3 | ITEM NO 3: Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below ,Stacking as directed by Engineer-In-Charge normal dewatering , preparing the bed for foundation and excluding back filling, etc .Complete | 8.64 | Cum | 629 | ₹5,434.56 |
| 4 | ITEM NO 4:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete. | 12.96 | Cum | 92 | ₹1,192.32 |
| 5 | ITEM NO 5 : Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all taxes (Central and local), inspection charges, transport to departmental stores/site, unloading and stacking etc. complete. 300 mm dia. RCC pipe class NP-II | 108 | Rmt | 650 | ₹70,200 |
| 6 | ITEM NO 6: Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge. 300 mm dia. RCC pipe class NP-II | 108 | Rmt | 228 | ₹24,624 |
| 7 | ITEM NO 7 : Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. As above of 60 x 45 cm internal size | 9 | No | 5,760 | ₹51,840 |
| 8 | Item No. 8:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. | 51.85 | Cum | 92 | ₹4,770.2 |
| 9 | 2) Ganesh Kapase Home To Bhagavat Kapase Home ITEM NO : 1 Excavation for foundation/pipe trenches in earth, soils, of all types ,sand, gravel , and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading. as directed ,normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete | 55.04 | Cum | 165 | ₹9,081.6 |
| 10 | ITEM NO : 2 Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below ,stacking and spreading as directed by Engineer-In-Charge, normal dewatering ,preparing the bed for foundation and excluding back filling, etc.complete. | 41.28 | Cum | 187 | ₹7,719.36 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_2291788.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .