Loading…
Loading…
Tender Value
₹3.7 L
EMD Value
₹11,130
Closing Date
16 Sept 2026, 6:55 pm4d left
office of the executive engineer rew ang
office of the executive engineer rew ang
EXTENSION OF CROSSING AT JOIBAL VEERI NEAR HOUSE OF BASHIR AHMAD GANIE BLOCK BIJBEHARA
2026_RDPR_324181_43
ENIT107of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹11,130
10 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | e/work in excavation by manual means in trenches for foundations cables drains etc inc its disposal cj | 4.69 | cum | 479.3 | ₹2,247.92 |
| 2 | p/l of stone solling tightly hand packed inc carriage cj | 0.55 | cum | 1,170 | ₹643.5 |
| 3 | providing and laying in position cement concrete 1:4:8 of specified grade using 40mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level | 0.27 | cum | 5,202.9 | ₹1,404.78 |
| 4 | providing and laying in position cement concrete 1:2:4 of specified grade using 20mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level | 5.71 | cum | 6,591.25 | ₹37,636.04 |
| 5 | centering and shuttering inc. strutting and propping etc inc. removal of same | 6.73 | sqm | 625.95 | ₹4,212.64 |
| 6 | providing and laying in position reinforced cement concrete 1:1.5:3 of specified grade using 20mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level | 1.1 | cum | 7,788 | ₹8,566.8 |
| 7 | reinforcement for rcc work inc cutting bending binding etc cj | 132 | kgs | 115 | ₹15,180 |
| 8 | demolishing of existing cement concrete manually/mechanically inc its disposal 1:3:6 cj | 6.79 | cum | 1,725.2 | ₹11,714.11 |
| 9 | demolishing of existing reinforced cement concrete manually/mechanically inc its disposal | 0.62 | cum | 2,516.85 | ₹1,560.45 |
| 10 | structural steel work in single up section fixed with or w/o connecting plates inc cutting hoisting etc inc a priming coat of spproved steel primer all complete | 1,991.98 | kgs | 138.2 | ₹2,75,291.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1093242.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .