| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC NO 6 76 EAST STREET THOPPUR MADURAI 625008 | MADURAI | MADURAI | TAMIL NADU | 625008 | ₹6.6 L | L1 | Accepted-AOC Award of contract |
| Sl No | Description | Qty | Unit | C RAJASEKARAN L1 |
|---|---|---|---|---|
| 1.00 | Clearing Juliflora jungle without uprooting including all cost of labour lead lift etc complete. | 100 | M2 | 6.3 ₹630 |
| 2.00 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m. | 27 | M3 | 90 ₹2,430 |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels.(Sand and Silt under water) | 7 | M3 | 90 ₹630 |
| 4.00 | HGS SS 20 B Earth work excavating and deposting on bank with initial lead of 10 m & & initial lift of 2m in Hard stiff clay, stiff black cotton, Hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | 1.4 | M3 | 126 ₹176.40 |
| 5.00 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete. | 1.5 | M3 | 1,800 ₹2,700 |
| 6.00 | PCC 1:3:6 mix using 40mm HBS Jelly machine crushed including cost of all labour materials lead lift curing etc complete without form work. With electricity supplied by Department at free of cost. | 5.5 | M3 | 5,400 ₹29,700 |
| 7.00 | PCC 1:4:8 mix using 40mm HBG machine crushed metal for foundation including cost of all labour materials lead lift curing etc complete. | 1.5 | M3 | 5,400 ₹8,100 |
| 8.00 | RCC 1:1.5:3 mix using 20mm HBS metal (machine crushed) for RAFT Concrete wihout formwork including all cost labour materials lead lift etc complete but excluding cost of steel reinforcement (By using mixer machine and vibrator) | 20 | M3 | 9,000 ₹1.8 L |
| 9.00 | PCC 1:2:4 using 20 mm metal for foundation without form work (up to Ground level ) | 2 | M3 | 7,002 ₹14,004 |
| 10.00 | PCC 1:2:4 using 20 mm metal for foundation with form work | 5 | M3 | 8,100 ₹40,500 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
4 Dec 2025, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Extension of exstg tr.pl and dismantling A frame at Sempatti 230/110 KV SS
2025_EB_627389_1
SE/GCC/Madurai F. Specn. No.042/2025-26
Limited
Civil Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
2 Jan 2026
28 Nov 2025
5 Dec 2025
29 Nov 2025
4 Dec 2025
29 Nov 2025
Amount
Clearing Juliflora jungle without uprooting including all cost of labour lead lift etc complete.
Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels.(Sand and Silt under water)
HGS SS 20 B Earth work excavating and deposting on bank with initial lead of 10 m & & initial lift of 2m in Hard stiff clay, stiff black cotton, Hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders.
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete.
PCC 1:3:6 mix using 40mm HBS Jelly machine crushed including cost of all labour materials lead lift curing etc complete without form work. With electricity supplied by Department at free of cost.
PCC 1:4:8 mix using 40mm HBG machine crushed metal for foundation including cost of all labour materials lead lift curing etc complete.
RCC 1:1.5:3 mix using 20mm HBS metal (machine crushed) for RAFT Concrete wihout formwork including all cost labour materials lead lift etc complete but excluding cost of steel reinforcement (By using mixer machine and vibrator)
PCC 1:2:4 using 20 mm metal for foundation without form work (up to Ground level )
PCC 1:2:4 using 20 mm metal for foundation with form work
Plastering CM 1:3 12mm thick, including cost of all materials, lead, lift etc complete.
supply and fixing of MS / RTS Reinforcement including cost of all materials, lead lift etc, complete.
Removing the excess earth to the near by bund or low laying area instructed by filed engineer inculding all lead,labour,lift,etc.,complete.
Colour Washing Two coats with exterior emulsion paint over one coat of emulsion primer.weather shield
Supply, Transport and fixing of 90 LBS Rail bit
Dismantling of plain cement concrete in the existing yard as instructed by filed engineer inculding all lead, labour, lift, etc.,complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_750099.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid