| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹8.3 L+₹9,104.63 (1.11%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
18 Aug 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT AGAMT II 2021-22 Krishnagiri Block- Providing Approach Cement Concrete Pavement, Compound Wall and Waiting Shed to Samathuva Burial Ground at Kattinayanapalli and Gangaleri Panchayat 2 works TN04KRI-368
2022_RDTN_245400_1
RocNo_42_2022_R10_22_07_2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
DRDA Krishnagiri
7 Sept 2022
3 Aug 2022
18 Aug 2022
3 Aug 2022
18 Aug 2022
3 Aug 2022
5 Aug 2022
Amount
1. Providing Approach Cement Concrete Pavement at Melkaradikuri Burial Ground (195m) H/O Kattinayanapalli Rs.5.91013 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requirng blasting including cost and conveyance of all etc., complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Provision for Bitumen Pad
Provision for Writing Name board charges
2. Providing Approach Cement Concrete Pavement(30m) and Compound Wall (20m) to Samathuva Burial Ground at Gangaleri Village H/O Gangaleri Rs.2.40 Lakhs
Construction of Compound wall
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
RR Masonry in CM 1:5 for foundation and Basement using new stones including necessary provision for bond stones
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Reinforcement Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS HBGmachine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Approach Cement Concrete
Earth work excavation for foundation in all class of soils except hard rock requirng blasting including cost and conveyance of all etc., complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Provision for Bitumen Pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Chinna Durai
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .