Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹23.2 L+₹1.1 L (4.82%)Rejected-Finance | L2 | Rejected-Finance L3 | |
| 3 | L3₹28.3 L+₹6.2 L (27.8%)Rejected-Finance ALKAPURI ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹56,600
Closing Date
17 Feb 2021, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER KEN CANAL DIVISION BANDA
EXECUTIVE ENGINEER KEN CANAL DIVISION BANDA
Repair of VRB at km 30.780 km 32.170 and km 35.780 and km 36.240 of Atarra branch and Outlet fixing 05 nos in bank side and 05 nos in service road side from km 30.000 to km 37.000 of Atarra branch at specified chainages
2021_UPIDC_554608_5
02/ken/nivida/2020-21 dt 03.02.2021
Open Tender
Civil Works
Item Rate
21 days
BANDA
Repair of VRB at km 30.780 km 32.170 and km 35.780 and km 36.240 of Atarra branch and Outlet fixing 05 nos in bank side and 05 nos in service road side from km 30.000 to km 37.000 of Atarra branch at specified chainages
2 documents required · 2 mandatory
₹354
₹56,600
Yes
7 Oct 2021
12 Feb 2021
17 Feb 2021
12 Feb 2021
17 Feb 2021
12 Feb 2021
90 days
Amount
Ist class Brick masonry with 1:4 cement sand mortar i/c all cost of materials, labour T&P etc complete
E/W in MKRK mixed soil in foundation within lead up to 30m & lift up to 1.50m including dressing, making profile and manual compaction etc complete
Sand Filling in foundation i/c all cost of materials, labour T&P etc complete
C.C. (1:3:6) with 20-40mm gauge stone grit i/c all cost of materials, labour T&P etc complete
R R Stone masonry with 1:4 cement sand mortar i/c all cost of materials, labour T&P etc complete
Grouted stone boulder pitching in 1:4 cement sand mortar i/c all cost of material, labour T&P etc
C.C. (1:1.5:3) with 10-20mm gauge stone grit i/c all cost of materials, labour T&P etc complete
E/W in MKRK mixed soil in correcting section of canal i/c lead up to 595m and lift up to 1.50m including dressing, making profile and manual compaction etc complete
Dry stone boulder pitching i/c all cast of material, labour T&P etc complete
Dismentlling of grouted stone pitching
Finishing walls with acrylic smooth paint of required shade of new work( two or more coat applied@ 1.60 lts/10 sqm over and i/c base coat of water proofing cement paint applied @ 2.20 kg/10 sqm)
Centering &shuttering i/c all cost of labour, material T&P etc complete
Struck raised cement pointing with 1:2 cement sand mortar i/c all cost of material, labour T&P etc complete
Struck deep cement pointing with 1:2 cement sand mortar i/c all cost of material, labour T&P etc complete
Supply and fixing of ceramic pipe 4"/6"dia i/c all cost of material carriage T&P etc complete
E/W in MKRK mixed soil in filling i/c lead up to 30.00 m and lift up to 1.50m including dressing, making profile and manual compaction etc complete
M/S PAWAR CONSTRUCTION
M/S SUNIL KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .