| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹55.4 LAccepted-AOC | ₹55.4 L | 1 | Accepted-AOC RANK 1 |
| 2 | 2₹62.9 LRejected-Finance | ₹62.9 L | 2 | Rejected-Finance RANK 2 |
| Sl No | Description | Qty | Unit | THE GOBIND COOP LABOUR AND CONSTRUCTION SOCIETY LTD. L2 | Veeramjit Singh Butter Govt Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. | 1 | cum | 104 ₹104 | 83 ₹83 |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | cum | 208 ₹208 | 191 ₹191 |
| 3.00 | First class burnt brick laid in cement sand mortar 1.6 in foundation and plinth. | 1 | cum | 6,700 ₹6,700 | 6,300 ₹6,300 |
| 4.00 | 10mm thick cement plaster on sides walls | 1 | sqm | 180 ₹180 | 172 ₹172 |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | sqm | 150 ₹150 | 132 ₹132 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | cum | 9,500 ₹9,500 | 9,200 ₹9,200 |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | cum | 5,500 ₹5,500 | 3,300 ₹3,300 |
| 8.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | cum | 4,500 ₹4,500 | 2,300 ₹2,300 |
| 9.00 | Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (including recarriage upto 3kms) | 1 | metre | 320 ₹320 | 298 ₹298 |
| 10.00 | jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) (including recarriage upto 3kms) | 1 | metre | 100 ₹100 | 79 ₹79 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
5 Mar 2026, 10:00 amClosed
EXECUTIVE ENGINEER LUDHIANA CANAL AND GROUND WATER
EXECUTIVE ENGINEER LUDHIANA CANAL AND GROUND WATER DIVN WRD NEAR DURGA MATA MANDIR PHASE 1 LDH
Estimate for laying underground RCC Pipeline for the Water Course of Outlet RD 40000/TL of Daroli Minor of Kingwah Distributary (Labour Component)
2026_WR_159893_5
558/28A
Open Tender
Civil Works - Canal
90 days
Kingwah Distributary
Estimate for laying underground RCC Pipeline for the Water Course of Outlet RD 40000/TL of Daroli Minor of Kingwah Distributary (Labour Component)
2 documents required · 2 mandatory
₹2,000
₹2.4 L
Yes
22 Mar 2026
11 Feb 2026
5 Mar 2026
11 Feb 2026
5 Mar 2026
11 Feb 2026
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class burnt brick laid in cement sand mortar 1.6 in foundation and plinth.
10mm thick cement plaster on sides walls
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. (including recarriage upto 3kms)
jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) (including recarriage upto 3kms)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
Providing and fixing of Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
Centreing & shuttering for Concerte faces
Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect
Dismantling of Brick work in Cement
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_324451.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid