| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance 58 KAILASHPURAM GOVINDPURAM GAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 LAdmitted-Finance | ₹8.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Meena Elect & Engg. Works L2 | SARASWAT ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.00Replacement of Damaged 33 KV Isolator box at 220 KV S/S Sahibabad. | |||||
| 1.01 | Providing and fixing of different make isolator operating box of 33KV isolator of size 250X250X150mm made of 18 no. SWG iron in place of damaged and defective (250x250x150mm) isolator box having fixed 01 no. bush for vertical operating rod, at the bottom of box fixing a plate of 150x150mm . the box should be duly painted with first coat of primer and double coat of enamel epoxy paint as per technical specifications, as per sample including dismentaling and connecting earthing properly. | 34 | Job | 8,500 ₹2.9 L | 3,200 ₹1.1 L |
| 2.00Replacement of 145 KV PT greater than 35 Years at 220 KV S/S Sahibabad. | |||||
| 2.01 | Dismantling of 145 KV PT including opening of associated cables, jumpers, earthing including cost of crane/hydra required manpower, consumables, T&P and shifting from site to store/designated place as as per direction of sitein-charge of Following bays- 1) 132 KV I.A Rathi/ PV Bay-3 Nos. 2) 132 KV Mohan Nagar Bay-03 Nos. | 6 | Nos. | 3,500 ₹21,000 | 4,600 ₹27,600 |
| 2.02 | Erection of 145 KV PT including shifting from store, associated jumpering work , control cable termination, , making earthing as per technical specifications and including cost of crane/hydra,required manpower, consumables, T&P of Following bays- 1) 132 KV I.A Rathi/ PV Bay-3 Nos. 2) 132 KV Mohan Nagar Bay-03 Nos. | 6 | Nos. | 4,500 ₹27,000 | 7,000 ₹42,000 |
| 3.00Replacement of 145 KV CT greater than 35 Years at 220 KV S/S Sahibabad. | |||||
| 3.01 | Dismantling of 145 KV CT including opening of associated cables, jumpers, earthing including cost of crane/hydra required manpower, consumables, T&P and shifting from site to store/designated place as as per direction of sitein-charge of Following bays- 1) 63MVA T/F-I HV Side (R,Y&B phase) 2) 132 KV Mohan Nagar Bay ( Y Phase) | 4 | Nos. | 3,500 ₹14,000 | 4,600 ₹18,400 |
| 3.02 | Erection of 145 KV CT including shifting from store, associated jumpering work , control cable termination, , making earthing as per technical specifications and including cost of crane/hydra,required manpower, consumables, T&P of Following bays- 1) 63MVA T/F-I HV Side (R,Y&B phase) 2) 132 KV Mohan Nagar Bay ( Y Phase) | 4 | Nos. | 4,500 ₹18,000 | 6,400 ₹25,600 |
| 3.03 | Complete/Safe transportation of 132 KV 400-200/1-1 A CT (Qty-4 No) from 132 KV S/S Vaishali to 220 KV Substation S/S Sahibabad under ETD-I Ghaziabad by using pvt Vehicle/hydra/crane including loading & unloading & carriaging & Shifting by manual labour at both substation. | 2 | Job | 10,000 ₹20,000 | 3,700 ₹7,400 |
| 4.00Replacement of Old & damaged 145 KV Isolator at 220 KV S/S Sahibabad | |||||
Tender Value
₹10.1 L
EMD Value
₹11,000
Closing Date
14 Oct 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
132 KV S/S Lalkuan Campus, Ghaziabad
Replacement of defective Isolator Box
2025_UPTCL_1076983_1
T-18/ETC/GZB/2025-26
Open Tender
Electrical Works
30 days
22KV SUBSTATION SAHIBABD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AS PER NIT
₹11,000
2 Jan 2026
24 Sept 2025
14 Oct 2025
24 Sept 2025
14 Oct 2025
24 Sept 2025
Amount
Replacement of Damaged 33 KV Isolator box at 220 KV S/S Sahibabad.
Providing and fixing of different make isolator operating box of 33KV isolator of size 250X250X150mm made of 18 no. SWG iron in place of damaged and defective (250x250x150mm) isolator box having fixed 01 no. bush for vertical operating rod, at the bottom of box fixing a plate of 150x150mm . the box should be duly painted with first coat of primer and double coat of enamel epoxy paint as per technical specifications, as per sample including dismentaling and connecting earthing properly.
Replacement of 145 KV PT greater than 35 Years at 220 KV S/S Sahibabad.
Dismantling of 145 KV PT including opening of associated cables, jumpers, earthing including cost of crane/hydra required manpower, consumables, T&P and shifting from site to store/designated place as as per direction of sitein-charge of Following bays- 1) 132 KV I.A Rathi/ PV Bay-3 Nos. 2) 132 KV Mohan Nagar Bay-03 Nos.
Erection of 145 KV PT including shifting from store, associated jumpering work , control cable termination, , making earthing as per technical specifications and including cost of crane/hydra,required manpower, consumables, T&P of Following bays- 1) 132 KV I.A Rathi/ PV Bay-3 Nos. 2) 132 KV Mohan Nagar Bay-03 Nos.
Replacement of 145 KV CT greater than 35 Years at 220 KV S/S Sahibabad.
Dismantling of 145 KV CT including opening of associated cables, jumpers, earthing including cost of crane/hydra required manpower, consumables, T&P and shifting from site to store/designated place as as per direction of sitein-charge of Following bays- 1) 63MVA T/F-I HV Side (R,Y&B phase) 2) 132 KV Mohan Nagar Bay ( Y Phase)
Erection of 145 KV CT including shifting from store, associated jumpering work , control cable termination, , making earthing as per technical specifications and including cost of crane/hydra,required manpower, consumables, T&P of Following bays- 1) 63MVA T/F-I HV Side (R,Y&B phase) 2) 132 KV Mohan Nagar Bay ( Y Phase)
Complete/Safe transportation of 132 KV 400-200/1-1 A CT (Qty-4 No) from 132 KV S/S Vaishali to 220 KV Substation S/S Sahibabad under ETD-I Ghaziabad by using pvt Vehicle/hydra/crane including loading & unloading & carriaging & Shifting by manual labour at both substation.
Replacement of Old & damaged 145 KV Isolator at 220 KV S/S Sahibabad
Dismantling of 132 KV Transfer BUS Isolator of 200 MVA T/F-I LV BAY
Dismantling of 132 KV Transfer BUS Isolator of 200 MVA T/F-II LV BAY
Dismantling of 132 KV Main Bus I & Main Bus II isolator of 132 KV SAHIBABAD-PRATAP VIHAR (I.A) BAY
Dismantling of 132 KV Main Bus -I side isolator of 132 KV Sahibabad-Mohan Nagar BAY
Dismantling of 132 KV Main Bus -II Isolator of 63 MVA T/F-I HV BAY
Dismantling of 132 KV Main Bus- I , Main Bus -II Isolator & Transfer Bus of 63 MVA T/F-II HV BAY
Dismantling of 132 KV Transfer Bus of 63 MVA T/F-III HV BAY
Dismantling of 132 KV Main Bus- I , Main Bus -II Isolator & Transfer Bus Isolator of 132 KV Bus Coupler BAY
ERECTION OF FOLLOWING 145 KV ISOLATOR OF FOLLOWING BAY AT 220 KV SAHIBABAD
Complete Erection of 132 KV Isolator including Hoisting of 132 KV Isolator post insulator (PI) in place of dismantlled Isolator PI including fixing of New 132 KV Male arm assembly and female arm assembly along with Allingment/Setting of all Male/female arm assembly of Following Isolator BAY- 1) 132 KV Transfer BUS Isolator of 200 MVA T/F-I LV BAY 2 ) 132 KV Transfer BUS Isolator of 200 MVA T/F-II LV BAY 3) 132 KV Main Bus I & Main Bus II isolator of 132 KV SAHIBABAD-PRATAP VIHAR (I.A) BAY 4) 132 KV Main Bus -I side isolator of 132 KV Sahibabad-Mohan Nagar BAY 5) 132 KV Main Bus -II Isolator of 63 MVA T/F-I HV BAY 6) 132 KV Main Bus-I & Main Bus -II Isolator of 63 MVA T/F-III HV BAY 7) 132 KV Main Bus- I , Main Bus -II Isolator & Transfer Bus of 132 KV Bus Coupler BAY
Dismantling of Jumpers of 132 KV equipment of ACSR Twin Zebra/Panther conductor from 132 KV Main Bus I/II to 132 KV Isolator & 132 KV Main Bus I/II/Line isolator to CB/PI including all associated work as per technical specification & site
132 KV Side Jumper with 132 KV Equipments.
Bay wise new interconnection of equipment with specified conductor of various 132 KV Equipment with Main /Transfer / jack Bus bar of ACSR Twin Zebra /Panther conductor. The work Includes cutting of conductor. Bending in proper shape clamping with the help of clamp and all other associated work to complete job.
132 KV Side Jumper with 132 KV Equipments.
Earthing of New Erected 145 KV Isolator at Two Point Using 50x6 MM M.S. Flat as per nomes of UPPTCL.
Safe Carriage of 132 KV Isolator from 220 KV S/S Shatabdinagar & 132 KV S/S Lohiya Nagar distance Approx-52 km . All T& P , manpower , Vehicle , fuel , toll fee etc. will under scope of contractor.
Safe Loading/Unloading of 132 KV Isolator at both ends , by mean of crane/Hydra . All required T&P , manpower , Vehicle , fuel , toll fee etc. will under scope of contractor.(2 Nos of isolator=01 Job)
REQUIREMENT OF CONNECTOR & CLAMP 145 KV ISOLATOR Replacement
CONNECTOR ,ISO 145KV SINGLE PANTHER as per sample
CONNECTOR,ISO,145KV,TWIN PANTHER as per sample
CONNECTOR ,ISO 145KV SINGLE Zebra as per sample
CONNECTOR,ISO,145KV,TWIN Zebra as per sample
PG CLAMP ZEBRA/ZEBRA
PG CLAMP ZEBRA/PANTHER
PG CLAMP PANTHER/PANTHER
PG CLAMP DEER/ZEBRA
SPACER TWIN PANTHER
Meena Elect & Engg. Works (BID ID -5606844)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid