Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.2 L+₹1.3 L (4.31%)Rejected-Finance 2 49 2 SANSKRITI NAVAGIRI NAGAR HOSEBETTU POST KULAI MANGALORE 575 019 | DAKSHINA KANNADA | KARNATAKA | 575019 | L2 | Rejected-Finance L2 | |
| 3 | L3₹33.3 L+₹2.5 L (8.09%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹35.1 L
EMD Value
₹70,275
Closing Date
1 Nov 2018, 11:00 amClosed
Director of Lighthouses and Lightships, Goa
Cruise Business Centre, 3rd floor, Mormugao Harbour, Mormugao, Goa
Construction of compound wall at Kaup Lighthouse Station, Karnataka.
2018_DGLL_391830_1
GOA/173/KPLH/CM/2017
Open Tender
Civil Works
Works
120 days
Kaup Lighthouse Station, Kaup
As per Tender Document
8 documents required · 8 mandatory
₹500
Director of Lighthouses and Lightships, Goa
₹70,275
Kaup Lighthouse Station, Kaup, Karnataka
30 Jan 2020
8 Oct 2018
2 Nov 2018
8 Oct 2018
1 Nov 2018
8 Oct 2018
8 Oct 2018 - 25 Oct 2018
26 Oct 2018
Amount
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge including cost of supply of all labours, tools & plants etc. complete.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge including cost of supply of all labours, tools & plants etc. complete: All Kinds of Soil.
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete as directed including cost of all materials, labour, tools & plants etc.
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) including cost all materials, labour, tools & plants etc. as directed by engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) including cost all materials, labour, tools & plants etc. as directed by engineer in charge.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as directed including cost of all materials, labour, tools & plants etc complete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete as directed including cost of all materials, labour, tools & plants etc.: Thermo-Mechanically Treated bars of grade Fe-500 D or more.
Construction of Coursed laterite stone masonry in superstructure above plinth level and upto floor five level in cement mortar 1:5 (1 cement : 5 coarse sand) with approved quality machine cut Laterite stone of size 300X200x150 mm as required or as directed including cost of curing and supply of all materials, labour, tools & plants, Scaffolding charges etc. complete as directed by the engineer in charge.
Fabricating, supply and fixing of Cast Iron grill of approved design and quality including fabricating/Casting all as per enclosed approved drawing/ design, all section of grill welded by cast iron welding rod wherever necessary as per site requirement and as directed and applying a priming coat of approved steel primer all complete as directed by Engineer-in-charge including cost of supply of all materials, labour, tools & plants, scaffolding, transportation, ladder and all other charges involved etc complete. For a span of 3.00 m c/c and height 900 mm the grill should weight 52 Kg/Sqm.
15 mm cement plaster on rough side of single or half brick wall of mix : 1:4 (1 cement: 4 coarse sand) including cost of supply of all materials, labour, tools and plants etc. complete as directed by Engineer-in-charge.
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge.
Finishing walls with Premium Acrylic Smooth exterior paint (Asian / Berger/or equivalent) with Silicone additives of required shade for New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) as directed including cost of all materials, labour, tools & plants etc., complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade as directed including cost of all materials, labour, tools & plants etc complete: Two or more coats on new work.
Providing and fixing broken glass pieces over coping of compound wall in cement concrete for security purpose including cost of all materials, labour, tools & plants etc complete as directed by engineer in charge.
Fabrication and supply of G.I. wicket gate of size 1.20m X 1.80m as per standard drawing/ as directed and fixing the same in position to the gate pillers in line and level including painting the gate with two coats of synthetic enamel paint of approved quality and colour over a coat of approved metal primer and cost of supply of all materials, labour, fabrication charges, transportation to site, scaffolding charges, fixing in position etc complete as directed.
sanjeeth
BHARATESH V KULAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .