Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC VILL AMSERUWA POST SIDDHOUR DISTT BARABANKI | BARABANKI | L1 | Accepted-AOC LOWEST QUOTED RATES | |
| 2 | L2₹3.4 L+₹12,536.28 (3.80%)Rejected-Finance | L2 | Rejected-Finance QUOTED RATES GREATER THAN L1 | |
| 3 | L3₹3.9 L+₹62,681.40 (19.0%)Rejected-Finance | L3 | Rejected-Finance QUOTED RATES GREATER THAN L2 | |
| 4 | Rejected-Technical | - | Rejected-Technical TECHNICAL BID NOT QUALIFIED |
| Sl No | Description | Qty | Unit | M/S SATYENDRA KUMAR SINGH L1 | M/S HARISH CHANDRA L3 | BAIKUNTHLAL L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work for silt clearance of dy by poclain/hydraulic excavator with lead lift etc. complete. | 8,357.52 | Cum | 34.5 ₹2,88,334.44 Lowest | 44 ₹3,67,730.88 | 35 ₹2,92,513.2 |
| 2.00 | Dressing of excavated silt | 8,357.52 | Cum | 5 ₹41,787.6 | 3 ₹25,072.56 Lowest | 6 ₹50,145.12 |
Tender Value
₹5.0 L
EMD Value
₹12,000
Closing Date
31 Oct 2025, 10:00 amClosed
EXECUTIVE ENGINEER BDSC BARABANKI
EXECUTIVE ENGINEER BDSC BARABANKI
SILT CLEARANCE OF SADULLAPUR DY FROM KM 0.000 TO 9.700
2025_UPIDC_1085205_9
04/EE/2025-26
Open Tender
Civil Works
Item Rate
15 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,151
₹12,000
29 Apr 2026
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BIDDOC04EE202526.pdf
Tender Documents • 2.45 MB
BOQ_1988570.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .