Tender Value
₹33 L
EMD Value
₹33,000
Closing Date
16 Oct 2020, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
Strengthening of road from Cumbum to Angoorpalayam to Gudalur to Karunakkamuthanpatti 0/0-2/65 in Cumbum
2020_RDTN_181137_1
DIPR/3344/TENDER/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹33,000
17 Oct 2020
24 Sept 2020
16 Oct 2020
24 Sept 2020
16 Oct 2020
25 Sept 2020
Amount
Renewal BT of road from Cumbum to Angoorpalayam to Gudalur to Karunakkamuthanpatti 0/0-2/65 in Cumbum Block
Clearing and grubbing by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth.
Earthwork excavation from borrow pits for filling in all classes of soils such as gravelly soil, hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel stone earth and earth mixed with 50% fair sized boulders and hard gravelly
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades, lines and profile and consolidation with power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc., complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for HM stone
Provision for KM stone
Sign Board
Name Board
Maintenance of PMGSY Road Towards the charges for routline maintenance of the road work executed under TNRRIS including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Gopinathan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .