Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.6 Cr
EMD Value
₹9.9 L
Closing Date
26 Nov 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
S.E., Hamirpur Circle, PWD Hamirpur
S.E., Hamirpur Circle, PWD Hamirpur
New Construction work of Dhaniram Ka Dera of Gram Bilauta to shankarpur Pahar dev Baba temple in block Kurara link Road
2026_CEBAN_1194839_3
1913/30C-Hamirpur Circle/2026 Date 03.10.2026
Open Tender
Civil Works - Roads
Percentage
240 days
PD PWD Hamirpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹9.9 L
S.E., Hamirpur Circle, PWD Hamirpur
26 Nov 2026
26 Oct 2026
26 Nov 2026
26 Oct 2026
26 Nov 2026
26 Oct 2026
27 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) | 6,824.4 | CUM | 90 | ₹6,14,196 |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% staked lime including its mixing with rotabator complete. | 6,032.4 | CUM | 351 | ₹21,17,372.4 |
| 3 | Providing, Laying and spreading material on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | 886.6 | CUM | 3,138 | ₹27,82,150.8 |
| 4 | Providing, Laying and spreading material on a prepared sub grade, adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | 1,155 | cum | 3,609 | ₹41,68,395 |
| 5 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. | 8,250 | Sqm | 27 | ₹2,22,750 |
| 6 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508 | 8,250 | Sqm | 226 | ₹18,64,500 |
| 7 | Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510 | 8,250 | Sqm | 88 | ₹7,26,000 |
| 8 | Construction of sub grade and earthen shoulders with approved materials obtained from boorrow pits with all lifts & leads, transporting to site, spreading, grading to required slop and compacted to meet requirement of table No. 300-2 | 2,362.3 | cum | 79 | ₹1,86,621.7 |
| 9 | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 159.8 | CUM | 404 | ₹64,559.2 |
| 10 | Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9. | 12.3 | cum | 1,912 | ₹23,517.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 6.05 MB
BOQ_2270919.xls
BOQ • 0.26 MB
Shu1913CMGSY.pdf
PDF • 0.15 MB
Shuddhipatra1913NewConst4.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .