Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | L1 | Accepted-AOC Work awarded | |
| 2 | L2₹3.2 Cr+₹3,452.04 (0.01%)Rejected-Finance V P O KARIAN TEH DISTT CHAMBA | CHAMBA | CHAMBA | HIMACHAL PRADESH | 176310 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹3.3 Cr+₹7.6 L (2.38%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
22 Mar 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Chamba Division, HPPWD Chamba
Executive Engineer, Chamba Division, HPPWD Chamba
Construction of Heliport at Sultanpur Chamba Distt. Chamba ( Sub Head Const. of passenger terminal building, construction of Fire building , Utility block , Watch tower, Security hut, Overhead water tank, underground water tank, Septic tank
2025_PWD_102016_1
No. PWC-WA-II/Contract/24-25- 21184-283 dated 10-3-2025
Open Tender
Civil Works - Buildings
Percentage
540 days
Chamba
Please refer Tender documents.
17 documents required · 17 mandatory
₹5,000
₹6.9 L
19 Apr 2025
15 Mar 2025
22 Mar 2025
15 Mar 2025
22 Mar 2025
15 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation and trenches in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rock, chiseling / wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailing out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-in-charge and disposal of all surplus excavated soil in acquired width or at an approved dumping side including its stacking leveling dressing including all leads and lifts by head-load, mechanical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HPPWD specification. Any loss to the public and private property during the course of execution and disposal of unserviceable material shall be absolute responsibility of the contractor which shall have to be compensated by him in all cases.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 1,528.54 | Per Cubic metr | 415.43 | ₹6,35,001.37 |
| 2.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights from floor including carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 475.47 | Per Square Metre | 558.5 | ₹2,65,550 |
| 3.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in foundation, footing, basis of columns etcetra and mass concrete including carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals.The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 383.05 | Per Square metre | 275.4 | ₹1,05,491.97 |
| 4.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Columns, pillars, posts and struts square rectangular or polygonal in plan including carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 246.56 | Per Square Metre | 692.3 | ₹1,70,693.49 |
| 5.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings and the like floor etcetra upto any thickness including carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 303.05 | Per Square Metre | 681.7 | ₹2,06,589.19 |
| 6.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Stair cases with sloping or stepped soffits excluding landing including carriage of material within all leads and lifts and as per the direction of the engineer-in -charge and other incidentals. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 9 | Per Square Metre | 574.1 | ₹5,166.9 |
| 7.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling upto any heights and removal of the same for insitu-reinforced concrete and plain concrete work in Edges of slabs and breaks in floors and walls upto all width and heights including carriage of material and other incidentals within all leads and lifts and as per the direction of the Engineer-in-charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 178.76 | Per Running metre | 163.8 | ₹29,280.89 |
| 8.01 | Providing form work with steel plates of 3.15mm (Three decimal fifteen millimetres) thick, welded with angle iron in frames of 30x30x5mm (Thirty into Thirty into Five millimetres), so as to give a fair finish including centering and shuttering with steel plate including strutting, propping etcetera and removal of form work for retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etcetera as per the directions of the Engineer-in-charge including carriage of material within all leads, lifts and other incidentals and further as per specification, approved Drawing & Design.The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 274.22 | Per Square metre | 568.6 | ₹1,55,921.49 |
| 9.01 | Providing and laying in position machine batched and machine mixed cement concrete work of grade M-20 (M-Twenty) design mix to obtain the minimum compressive strength of 20N/mm2 (Twenty newton per square millimetre) for reinforced cement concrete work @320 kg/cum (at the rate Three hundred twenty kilogram per cubic metre) or as per approved design mix All works above plinth level upto floor all level to give a smooth surfaces mechanically mixed and vibrated including curing complete and pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability for reinforcement cement concrete work including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-in-charge. The rate is including of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 167.96 | Per Cubic metre | 9,592.2 | ₹16,11,105.91 |
| 10.01 | Providing and laying in position machine batched and machine mixed cement concrete work of grade M-25 (twenty five) design mix to obtain the compressive strenght of 25N/mm square ( twenty five newton per square millimetre ) for reinforced cement concrete work, in all work up to plinth level using minimum cement content not less than 360 KG/Cum (Three hundred sixty kilogram per cubic metre) or as per approved design mix to give a smooth surface mechanically mixed and vibrated including curing completed and pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability for reinforced concrete work including carriage of material within all lead ,lift and other incedental as per specification approved drawing design and as per direction of Engineer-in-charge.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government . | 129.6 | Per Cubic metre | 10,762.3 | ₹13,94,794.08 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 1.02 MB
Biddocument.pdf
Tender Document • 6.97 MB
BOQ_149964.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .