Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.8 Cr
EMD Value
₹33.8 L
Closing Date
21 Feb 2020, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, W/Z, PWD, AP
Chief Engineer, W/Z, PWD, AP, Itanagar
Road and bridges
2020_PWDAP_305_1
CD/DRG-2/RIDF/2018-19/02
Open Tender
Civil Works
Item Rate
1095 days
Chayangtajo
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹33.8 L
Yes
O/o SE, Sagalee Circle, PWD
2 Mar 2020
3 Feb 2020
2 Mar 2020
3 Feb 2020
21 Feb 2020
8 Feb 2020
6 Feb 2020
45 days
Amount
(SH I:- Formation Cutting)
Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres
Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
(SH: RCC Slab Culvert 1.50 m Span)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary soil
Manual Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical s
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
(SH: RCC Slab Culvert 2 m Span)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Manual Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
(SH: RCC Slab Culvert 3 m Span)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Manual Means
Depth upto 3 m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
PCC Grade M15
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
PCC Grade M20
Using Concrete Mixer
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
Height upto 5m
Reinforcement of RCC work including bending binding and placing in position complete.(a) Cold twisted/TMT bars
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
(SH: RCC Slab Culvert 6 m Span)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Manual Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
(SH: Retaining Wall 3.00 Mtr. Height )
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a
Ordinary soil
Manual Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
Dry Rubble flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material
(SH: Breast Wall 3.00 Mtr. Height )
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Manual Means
upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
(SH: Kutcha Drain )
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres))
Manual Means
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.)
Manual Means
(SH: RCC Bridge 40 Mtr. Span )
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Manual Means
upto 3 m depth
Ordinary rock (not requiring blasting)
Manual Means
Depth upto 3 m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Providing and laying RCC with M-35 concrete (1:1:2) (1 Cement: 1 sand : 2-20 mm nominal size of stone aggregate) in bearing cap, return wall, dirt wall, etc. excluding cost of and reinforcement complete as directed.
In abutment
In abutment Cap
In dirt wall, wing
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (C) PCC Grade M25 (p) Height upto 5m Case I Using concrete Mixer
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (D) PCC Grade M30 (p) Height upto 5m Case I Using concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Providing weep holes 10mm diameter with AC pipe, extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per the drawing and technical specifications.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
SUPER STRUCTURE
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (E) PSC Grade M-40 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (B) RCC Grade M25 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
a) In kerb
b) in approach slab
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space post for expansion, complete as per approved drawings and technicalbetween vertical specifications.
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.)
Drainage Spouts complete as per drawing and Technical specification
Mastic Asphalt Providing and laying 12mm thick mastic Asphalt wearing coarse on top of deck slab excluding primecoat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laied to required level.
PROTECTION WORK
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.)
SUB- STRUCTURE
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary soil
Manual Means
upto 3 m depth
Ordinary rock (not requiring blasting)
Manual Means
Depth upto 3 m
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Providing and laying RCC with M-35 concrete (1:1:2) (1 Cement: 1 sand : 2-20 mm nominal size of stone aggregate) in bearing cap, return wall, dirt wall, etc. excluding cost of and reinforcement complete as directed.
In abutment
In abutment Cap
In dirt wall, wing
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (C) PCC Grade M25 (p) Height upto 5m Case I Using concrete Mixer
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (D) PCC Grade M30 (p) Height upto 5m Case I Using concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Providing weep holes 10mm diameter with AC pipe, extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per the drawing and technical specifications.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
SUPER STRUCTURE
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (E) PSC Grade M-40 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (B) RCC Grade M25 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
a) In kerb
b) in approach slab
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space post for expansion, complete as per approved drawings and technicalbetween vertical specifications.
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.)
Drainage Spouts complete as per drawing and Technical specification
Mastic Asphalt Providing and laying 12mm thick mastic Asphalt wearing coarse on top of deck slab excluding primecoat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laied to required level.
PROTECTION WORK
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.)
AT TRADE AGENCY
M/s N.T Enterprise
M/S T N T ENTERPRISES
M/s Puna Hinda
M/S P P ENTERPRISE
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .