Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
24 Jul 2026, 2:00 pm
EE, NMD ,PHE Dte
OFFICE OF THE EXECUTIVE ENGINEER ,NORTHERN MECHANICAL DIVISION ,PHE Dte.SILIGURI SUKANTA SARANI, PARESH NAGAR, SILIGURI, PIN 734001
Operation and maintenance of sub-stations and Pumping machineries at Intake, Intermediate and Sindhap Water Treatment Plant sites under Darjeeling WS Pumping Scheme, P.H.E., Dte
2026_PHED_1030412_1
WBPHED/EE/NMD/NIeT- 01 OF 2026-2027
Open Tender
MECHANICAL
365 days
Darjeeling
Please refer Tender documents.
5 documents required · 5 mandatory
₹3.1 L
Yes
1 Jul 2026
1 Jul 2026
27 Jul 2026
2 Jul 2026
24 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1INTAKE POINT | |||||
| 1.1 | 6.3 MVA, 33 KV / 6.6 KV / 0.433 KV Subtation :- | - | - | - | - |
| 1.11 | Labour charges for day to day round the clock operation of 2X 6.3 MVA of Rating 33 KV / 6.6 KV / 0.433 KV sub-station with indoor type breaker, VCB 1250A (existing 1 no. single panel VCB + 1 no. 3 panel VCB ), HV and LV panel boards, control panel board, on load tap changer including capacitor bank, 110 volt DC trip circuit with maintenance free batteries, battery charger, ACBs and other allied accessories including sweeping cleaning of sub-station's switch yard, control room, office room, toilets etc. by engaging electrical supervisor, electrician etc. as per direction of EIC. for 12 months. ( w.e.f 01.08.2026 to 31.07.2027) | 12 | Months | - | - |
| 1.12 | Routine and periodical maintenance of LT & HT panel board, cable, capacitors, transformers, battery with battery charger, CTs & PTs, earthing system, all breakers, on load tap charger, tightening nuts & bolts of bus bar, replacement of control fuses, cleaning of Isolators etc. as per direction of EIC.
for 12 months ( w.e.f 01.08.2026 to 31.07.2027) | 12 | Months | - | - |
| 1.13 | Servicing and testing of all existing and proposed to be installed ACBs including LT panel board, checking of complete wiring of CTs and PTs with insulation of bus bar, regrassing the contacts and meters within ten days of contracts as direction by the EIC. (Twice in a year)
for 12 months ( w.e.f 01.08.2026 to 31.07.2027) a] All O/C, U/V, S/C relays. b] Calibration of all meters. c] ACBs shunt trip circuit. | 1 | Lot. | - | - |
| 1.14 | Servicing, testing and calibration of 4 nos 33KV VCB panel,2 nos Transformer of 6.3 MVA 33KV/6.6KV,6nos 6.6 KV Panel, 2nos RTCC panel, 2 nos relay panel of Metering room including all following IDMT, instantaneous and differential relays by any testing agency approved by WBSEDCL or Directt. Of Electricity Board as per direction of EIC. (Twice in a year)
for 12 months ( w.e.f 01.10.2024 to 30.09.2025)
a] Non directional IDMT O/C and E/F with high set relays. b] M-pact SCB's release. c] Trans. Differential relays, d] All the auxiliaries realys. e] Bucholtz relay with alarm and trip. f] Shunt trip circuit. g] Alarm, trip and enunciator circuit. h] Calibration of all meters Test result should be submitted at the time of measurement. | 1 | Lot. | - | - |
| 1.2 | Pumping Machinery :- | - | - | - | - |
| 1.21 | Labour charges for day to day operation of 3 nos. 1260 KW capacity pumping machineries (max two will be operated at a time and one will be stand by), operation of one no dewatering pumps and other electrical / mechanical accessories including sweeping cleaning of pump house, toilets etc. by engaging skilled, semiskilled and un-skilled personnel in all 3 shifts as per direction of EIC.
for 12 months | 12 | Months | - | - |
| 1.22 | Routine and periodical maintenance of pumps, motor, starters, valves with actuators control panel, dewatering pumps, LT distribution panel boards, cables, tightening nut bolt of sluice valve, dismantling joints etc including replacement of control fuses, gland packing of pumps, approved quality lubricants for motor bearing, pump bearing etc. as per direction of EIC.
for 12 months | 12 | Months | - | - |
| 1.23 | Servicing, testing and calibration of 6.6 KV gear as 6.6 KV incoming gear, 3 nos. motor starter panel along with reactor and capacitors as per direction of EIC. (Twice in a year)
for 12 months | 1 | Lot. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.23 MB
Tendernotice_3.pdf
PDF • 0.53 MB
BOQ_2530198.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid