Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -4.51% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 CrAdmitted-Finance | +19.92% | ₹1.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.5 CrAdmitted-Finance | +40.00% | ₹1.5 Cr | L3 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
22 Jun 2026, 6:00 pmClosed
Executive Engineer
Office of The Executive Engineer SNIP Division Ist CAD Hanumangarh
CONSTRUCTION OF PUCCA WATER COURSE IN CHAK 2 DNG ON RISK AND COST BASIS
2026_CECAD_566836_1
SNIP_NIB_02_2026-27
Open Tender
Civil Works
180 days
Hanumangarh
As per tender documents
3 documents required · 3 mandatory
₹1,000
Executive Engineer SNIP Div Ist CAD Hanumangarh
₹2.2 L
Yes
24 Jun 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work
Earth work for water courses in ordinary soil with all leads and lifts, dressed as per Specification. | 18,598.03 | Per 10 Cum | 293 | ₹54,49,222.79 |
| 2 | Dressing of earthwork | 18,598.03 | Per 10 Cum | 20 | ₹3,71,960.6 |
| 3 | Ramming of Earth work in ordinary soils in layers by wooden or Iron rammers as per specification. | 17,609.79 | Per 10 Cum | 65 | ₹11,44,636.35 |
| 4 | Lining
Watering, ramming and dressing of sub grade including removal of irregularities upto 15 cm depth | 8,272.31 | Per 10 Sqm | 95 | ₹7,85,869.45 |
| 5 | Brick masonry in cement mortar (1:5) including cost of all materials including mechanical mixing of mortar with all leads and lifts and stacking etc. complete in all respect. | 1,404.01 | Per Cum | 4,322 | ₹60,68,131.22 |
| 6 | 10 mm thick cement plaster in cement mortar (1:4) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads and lifts and stacking etc with curing for specified period complete in all respect. | 14,307.85 | Per 10 Sqm | 1,713 | ₹2,45,09,347.05 |
| 7 | Pucca Structures
Earth work excavation in foundation trench in ordinary soil for structures and then refilling soil in 15 cm. layers with all leads and lifts. | 6,352.4 | Per 10 Cum | 293 | ₹18,61,253.2 |
| 8 | Cement concrete (1:4:8) including cost of all materials including using mechanical mixer with aggregate size 40 mm with all leads and lifts and stacking etc. complete in all respect. | 100.98 | Per Cum | 3,153 | ₹3,18,389.94 |
| 9 | Brick masonry in cement mortar (1:6) including cost of all materials including mechanical mixing of mortar with all leads and lifts and stacking etc. complete in all respect. | 228.37 | Per Cum | 4,304 | ₹9,82,904.48 |
| 10 | 8 mm thick cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads and lifts and stacking etc. complete in all respect. | 919.04 | Per 10 Sqm | 1,544 | ₹14,18,997.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_1008405.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid