Loading…
Loading…
Tender Value
₹7.2 L
EMD Value
₹14,400
Closing Date
30 Apr 2026, 4:00 pmClosed
Executive Engineer Tissa Division HPPWD Tissa
Executive Engineer Tissa Division HPPWD Tissa
Restoration of rain damages on Rakhalu Jassourgarh Chanju road Km 0/0 to 12/0 (SH Providing R/wall at Rd 10/965 to 10/977.50, 11/063 to 11/073, and 11/080 to 11/085 under PDNA 2023)
2026_PWD_135101_4
613-712 date 18-04-2026
Open Tender
Civil Works
Percentage
90 days
Tissa
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹14,400
28 Apr 2026
25 Apr 2026
30 Apr 2026
25 Apr 2026
30 Apr 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305 and 1603.4 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimetree) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, sale tax GST or any other taxes imposed by the Government. | 91.39 | Per Cubic Metre | 300 | ₹27,417 |
| 2.01 | Providing and laying of boulder apron or gabion walls laid in wire crates with 4mm (four millimeter) dia G.I. wire (Galvanized iron wire) conforming to IS: 280 (IS:two hundred eighty) and IS: 4826 (IS: four thousand eight hundred twenty six) in 100mmx100mm (one hundred millimeter into one hundred millimeter) mesh (woven diagonally) including 10% (ten percent) extra for laps and joints, laid with stone boulders weighing not less than 25 kg (Twenty five kilogram) each as per drawing and technical specification clause 1301 or as per the directions of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidentals. he rate including the octroi, royality, Malkana, toll tax, sale tax GST or any other taxes imposed by the Government. | 234.37 | Per Cubic Metre | 2,850 | ₹6,67,954.5 |
| 3.01 | Back filling with granular material behind abutments, return walls, wing walls and retaining walls complete as per drawings and MORD technical specification clause 1204.3.8 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including octroi, royalty ,Malkana, toll tax, sales tax GST or any other taxes imposed by the Government. | 29.06 | Per Cubic Metre | 750 | ₹21,795 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.15 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_199998.xls
BOQ • 0.25 MB
4.pdf
Tender Documents • 5.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .