Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Work is awarded to the lowest bidder (L-1) M/s Anil Construction |
| 2 | L2₹2.1 Cr+₹12.4 L (6.37%)Rejected-Finance B 16 DEENDAYAL MARKET POWER HOUSE ROAD KORBA KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹2.1 Cr+₹12.4 L (6.37%) | L2 | Rejected-Finance Quoted amount more than lowest bidder (L1) |
| 3 | L3₹2.2 Cr+₹20.5 L (10.5%)Rejected-Finance 220 A P COLONY GAYA BIHAR 800023 | PATNA | BIHAR | 800023 | ₹2.2 Cr+₹20.5 L (10.5%) | L3 | Rejected-Finance Quoted amount more than lowest bidder (L1) |
| 4 | L4₹2.2 Cr+₹27.6 L (14.2%)Rejected-Finance | ₹2.2 Cr+₹27.6 L (14.2%) | L4 | Rejected-Finance Quoted amount more than lowest bidder (L1) |
| 5 | L5₹2.3 Cr+₹39.2 L (20.1%)Rejected-Finance BLOCK NETURIA JL NO 21 KHAITAN NO 912 PLOT NO 913 MOUZA GUNIARA GUNIARA GUNIARA VILLAGE TOWN GUNIARA CITY NETURIA | ₹2.3 Cr+₹39.2 L (20.1%) | L5 | Rejected-Finance Quoted amount more than lowest bidder (L1) |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
20 Jan 2020, 6:00 pmClosed
AGM (E-C)
O/o AGM (E-C), AAI, S.V. Airport, Raipur.
Construction of perimeter road along new boundary wall at 24 side on balance land at S.V. Airport, Raipur.
2019_AAI_31873_1
AAI/RP/Engg-C/AGM/CW-07/2019
Open Tender
Civil Works
Item Rate
240 days
AAI, S.V. Airport
As per tender notice
13 documents required · 13 mandatory
₹1,120
Airports Authority of India
₹5.1 L
4 May 2020
9 Jan 2020
24 Jan 2020
9 Jan 2020
20 Jan 2020
9 Jan 2020
9 Jan 2020 - 17 Jan 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. a) All kinds of soil
Supplying and filling gravelly soil (inclusive of royalty & carriage) suitable for embankment construction in layers of 20 cms compacted depth, breaking the clods/ over size material, removal of stumps/roots and the like while spreading, consolidating each layer with vibratory road rollers of 80 to 100 KN static weight to not less than 95 % of the maximum laboratory dry density as per IS 2720 (Part 8) and fine dressing to required grade and cross slope as directed by Engr.-in-charge and as per particular specification.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
b) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). a) All works upto plinth level
Add for using extra cement in the items of design mix over and above the specified cement content therein.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : (a)Foundations, footings, bases of columns, etc. for mass concrete
(b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
(c) Suspended floors, roofs, landings, balconies and access platform
(d) Edges of slabs and breaks in floors and walls Above 20 cm wide
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion. a) On W.B.M / W.M.M. @ 0.4kg/sqm
b) On bituminous surface @ 0.25kg/sqm
Providing and laying of Hot Mix Dense Bituminous Macadam (DBM) using crushed stone aggregate of quality, size and grading as specified an cement filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8 to 10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction,strength, surface accuracy complete [for tendering purpose VG bitumen of grade VG-30 shall be taken as 110 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material.]
Providing and laying of Hot Mix Semi Dense Asphaltic Concrete (SDAC) using crushed stone aggregate of quality, size and grading as specified and cement as filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels,grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 120 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material].
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete. a) New work (Two or more coats)
Providing and laying Non Pressure NP-3 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. a) 450 mm dia RCC pipes.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Consolidation of sub grade with power road roller of 8 to 12 tonne capacity and rolling the sub grade.
NEELKANTHAM SYSTEMS PVT LTD
M/s Awadhesh Construction
Vishal Builders
Mahamaya Construction Company
PRAKASH CHAND RAI
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .