| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.9 L+₹25,493.16 (4.53%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.3 L+₹71,980.69 (12.8%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_317708_2
Short e-NIT No. DRSP/55 of 2026-27 Dated 24-07-2026
Open Tender
Civil Works
Percentage
90 days
Banota
eNIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹20,000
R S Pura
10 Aug 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge.1:3:6 or richer mix. | 6 | cum. | 1,725.2 | ₹10,351.2 |
| 2 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil. | 255.78 | cum. | 256.85 | ₹65,697.09 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 26.46 | cum. | 4,826.5 | ₹1,27,709.19 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 58.7 | cum. | 5,733.6 | ₹3,36,562.32 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.05 | cum. | 9,821.85 | ₹39,778.49 |
| 6 | Reinforcement for RCC work with TMT (Thermo Mechanically Treated bars) including straightening, cutting, bending, placing in position and binding all complete. | 364.5 | kg | 123.2 | ₹44,906.4 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of formwork for Foundations, footings, bases for columns. | 392 | sqm. | 286.35 | ₹1,12,249.2 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of formwork for Suspended floors, roofs, landing, balvonies and accwss plateform. | 27 | sqm. | 718.2 | ₹19,391.4 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of formwork for Edges of slabs and breaks in floors and walls below 20cms wide | 54 | Rm | 262.2 | ₹14,158.8 |
| 10 | Placing and laying Cement conc. Flooring 1:2:4 mix, 50mm thick. | 88.2 | sqm. | 416.5 | ₹36,735.3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1042645.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .