Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.8 LAccepted-AOC | 1 | Accepted-AOC Due to lower rate | |
| 2 | 2₹52.5 L+₹8.7 L (19.9%)Rejected-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | 2 | Rejected-AOC Due to higher rate | |
| 3 | Not Admitted-Technical | - | Not Admitted-Technical Others-Valid Enlistment of PHED not found | |
| 4 | Not Admitted-Technical 220 SECTOR 9 JIND | JIND | JIND | HARYANA | - | Not Admitted-Technical Others-EMD Exemption Declaration form not attached |
Tender Value
₹48.7 L
EMD Value
₹97,324
Closing Date
22 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EE PHE Division Narwana
Providing of lifting system of raw water from Barwala Branch at outlet RD-25000-R for drinking water supply facility to water works village Surbrah.
2023_HRY_289031_1
2023E7001AF7 8194 44DA A7D5 2B50115E520A570PUH
Open Tender
Civil Works
Works
400 days
SURBRAH
4 documents required · 4 mandatory
₹2,500
₹97,324
Yes
16 Aug 2023
8 Jun 2023
22 Jun 2023
8 Jun 2023
22 Jun 2023
8 Jun 2023
Amount
Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 20.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP Discharge Capacity (LPM) 600 Power Capacity (BHP) 5
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1)Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
charan singh contractor(GSTN-NA)
PARAMJEET CONTRACTOR(GSTN-NA)
PARAMJEET CONTRACTOR
PARAMJEET CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .