Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.9 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | 1 | Accepted-AOC Being lowest and reasonable rates | |
| 2 | 2₹31.9 L+₹3.1 L (10.6%)Rejected-Finance A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | 2 | Rejected-Finance Not being lowest tenderer | |
| 3 | 3₹32.0 L+₹3.1 L (10.8%)Rejected-Finance WZ 831 NANGAL RAYA PANKHA ROAD NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | 3 | Rejected-Finance Not being lowest tenderer | |
| 4 | 4₹39.5 L+₹10.6 L (36.8%)Rejected-Finance | 4 | Rejected-Finance Not being lowest tenderer | |
| 5 | Rejected-Technical | - | Rejected-Technical Being NO in WLR |
Tender Value
Refer Docs
EMD Value
₹68,500
Closing Date
12 Nov 2020, 6:00 pmClosed
CWE U
HQ CWE U Delhi Cantt 110010
COMPREHENSIVE MAINTENANCE OF ELECTRICAL PASSENGER LIFTS INSTALLED AT KABUL LINE AND TODAPUR UNDER GE (U) P AND M DELHI CANTT 10
2020_MES_373510_1
89035/CWE(U)/D-14/2020-21/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
Delhi Cantt
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE U PLANT AND MACHINARY
₹68,500
Yes
23 Dec 2020
8 Sept 2020
14 Nov 2020
8 Sept 2020
12 Nov 2020
31 Oct 2020
Amount
Taking down and supply & fixing in replacement Door Roller ( U Roller/ bearing) suitable for Johnson/ Thyssen Krupp make for the 13/08 passenger lift complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement Door Roller ( V Roller / bearing) suitable for Johnson/ Thyssen Krupp make lift for the 13/08 passenger complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement CW shoe liner button type suitable for Johnson/ Thyssen Krupp make lifts for the 13/08 passengers complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & Fixing ,installing,testing and commissioning in replacement alongwith all connected accesories for VVVF drive 7.5 KW, 380/480 Volts 50 HZ as per sample for Jhonson make lifts suitable for serving Ground + 8 Floors (total nine landings) with electric power operated doors, complete all as specified and directed for 08 passenger lift. (Make:- As per OEM )
Taking down and supply & Fixing ,installing,testing and commissioning in replacement alongwith all connected accesories for VVVF drive 11 KW, 380/480 Volts 50 HZ as per sample for Jhonson make lifts suitable for serving Ground + 8 Floors (total nine landings) with electric power operated doors, complete all as specified and directed for 13 passenger lift. (Make:- As per OEM )
Taking down and supply & fixing in replacement of Stainless steel OSG rope of size 6 starnds x 19 of normal dia 06mm for the 08/13 passenger lift all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement of CI pit pully as per sample for ThyssenKrupp/Johnson make lifts suitable for serving Ground + 8 Floors (total nine landings) Complete all as specified and directed for 13/8 passenger lift.(Make:- As per OEM )
Taking down and supply & fixing in replacement SG 227 ,CPU card for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement Hard ware card (SG 219 HW Card) for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement DCL card for the 13/08 passenger liftsThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM)
Supply & fixing in replacement Landing interface card for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement CPU (M) SG 230 for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement of Yellow bracket for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Taking down and supply & fixing in replacement Landing display for the 13/08 passenger lifts ThyssenKrupp/Johnson complete with wiring all as specified and directed. (Make:- As per OEM )
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + 8 floors (total nine landings) with electric power operated doors, auto electric levelling device installed complete all as specified and directed. KABUL LINE,Block No 149,150 and 154 (08 passenger lift) =3 Nos.Make - Johnson Lifts Todapur ,Block No P-6,7 & 8 (08 passenger lift) =3 Nos. Make - Johnson Lifts KABUL LINE,Block No 163 Type VI (08 passenger lift) =01Nos.Make - Thyssenkrupp Lifts
Comprehensive maintenance of installed lift in reliable safe and efficient operating condition through MOU with OEM by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + 8 floors (total nine landings) with electric power operated doors, auto electric levelling device installed complete all as specified and directed. KABUL LINE,Block No 149,150 and 154 (13 passenger lift) =3 Nos.Make - Johnson Lifts Todapur ,Block No P-6,7 & 8 (13 passenger lift) =3 Nos. Make - Johnson Lifts .KABUL LINE,Block No 163 type VI (13 passenger lift) =01Nos.Make - Thyssenkrupp Lifts
Note for item No 15 & 16 : -
(Comprehensive maintenance) (i) The above maintenance shall be done through OEM of existing lifts. Please also refer Sch 'A' Notes. (ii) The contractor will have to submit MOU as given in Particular Specifications from OEM of M/s ThyssenKrupp & M/s Johnson within fifteen days of acceptance of tender, failing which the contract will be liable to be cancelled and further action to be taken as per policy in vogue. (iii) Contractor will conclude AMC with OEM ( Johnson-Gold Agreement & Thyssen Krupp-Platinum Agreement) of existing Lifts and copy of the agreement and along with invoice copy will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as required for smooth and efficient functioning of the equipment/lift. (v) Scope of AMC shall include repair replacement of machines, motors, generators,door ropes, inverter/ARD system, PCBs, belts, rollers, gears,bearings,solenoids,coils,chock brake shoes, liners,contactors, relays, coils, pushbuttons, door operator VVF drive,VVVF main drive,cardoor safety device limit switches,governor,hoistway door locks,indicators and other minor machanical parts. The cost shall deemed to be included in the rates quoted by the contractor.
(vi) Following items are not included : Replacement of car cabin, ceiling frames, panels, hoist way door panels, door frames, sills, car flooring, floor covering, lighting fixtures, ceiling light bulbs and tube, main line power switches, breakers, feeders to controller, hoist way wiring, hydraulic jack outer casing, burried piping, alignment of elevator guide rails,smoke and fire sensors, communication devices, security systems, landing doors,sheave rim,hoist rope & ARD battery and cabin fans. (vii) The OEM will also detail one technical staff to inspect the lift every week, regarding its functioning operation or any other issue arising in the lift. The problem noticed if any to be addressed immidiately. In case no technician is detailed, Rs 500/- per week per lift will be deducted from the payment. Technician shall always carry service tool along with him during each weekly visit. (viii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (ix) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge.
M/s Adhikari construction co.
Tushar engineers
GURBUX SINGH AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .