chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction work for the boundary wall railings and footpath at the British-era Cemetery in Ward No. 56 Sangam Vihar
2026_NNSAH_1154549_1
2416 G
Open Tender
Civil Works
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.8 L
3 Jun 2026
3 Jun 2026
23 Jun 2026
3 Jun 2026
22 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordnary soil including lift upto 30M and including filling watering (S.I - 251) | 131.76 | cum | 110 | ₹14,493.6 |
| 2 | Concrete with 4c.m. gauge brick ballast, fine send of 1:25 R.M. and cement, in proportion of 12:6:1 in foundation and under floors Tools & plants etc. required for proper completion of the work.(S.I - 273) | 27.34 | cum | 2,985 | ₹81,597.96 |
| 3 | Disposal of waste malba from site upto 5.0 km i/c all comp of M-150 Brick Work in 1:3 cement & coarse sand Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper ompletion of the work. (Sl -307) | 39.46 | cum | 4,765 | ₹1,88,036.43 |
| 4 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast, coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.289) | 23.33 | cum | 7,800 | ₹1,81,958.4 |
| 5 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast, coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.289) | 34.41 | cum | 7,800 | ₹2,68,405.8 |
| 6 | Reinforcement and its bending, but including its fixing and binding centering and shuttering etc. and supply of all materials, Labor ,Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.S.I.504 | 6,798.76 | kg | 85.29 | ₹5,79,866.24 |
| 7 | M-150 Brick Work in 1:3 cement & coarse sand Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper ompletion of the work. (S.I. - 307+309) | 84.73 | cum | 4,995 | ₹4,23,211.37 |
| 8 | 12 mm thick plaster with with cement and approved coarse sand mortar in 1:3. over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 484.2 | sqm | 165 | ₹79,893 |
| 9 | Two coat of painting with synthetic enamel paint (Asian / Berger) over one coat of primer including supply of all materials, labours and T&P etc. (SI- 644) | 484.2 | sqm | 70 | ₹33,894 |
| 10 | Snowcem two coats of approved quality (Acrocem) including supply of all materials, laoburs and T&P etc. (SI - 660) | 484.2 | sqm | 70 | ₹33,894 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.38 MB
BOQ_2162692.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid