Executive Engineer HPPWD Division Barsar
Executive Engineer HPPWD Division Barsar
C/O Toilet,Repair of plaster,Tilling, Paver block, Distempering work other work etc
2026_PWD_144197_5
5963-6062 dated 19-09-2026
Open Tender
Civil Works - Roads
Percentage
60 days
Barsar
Please refer Tender documents.
15 documents required · 15 mandatory
₹500
₹11,500
28 Sept 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 mtr (one point five metre) in width or 10 sqm (ten square metre ) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, (one point five metre) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mtr (fifty metre) all kinds of soil lifts as directed by the Engineer-in-charge and including entire carriage of material in all leads and lifts disposed materials to be neatly leveled. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 6.91 | Cubic metre | 206.14 | ₹1,424.43 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 ( one cement : four coarse sand: Eight graded stone aggregate) 40 mm (forty millimetre ) nominal size all work up to plinth leve including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 0.91 | Cubic metre | 4,011.82 | ₹3,650.76 |
| 3 | Providing and laying cement concrete in retaining walls return walls ,walls (any thickness) including attached pilasters , columns, piers,abutments,pillars, post, strtus buttresses string or lacing courses parapets,coping bed block s,anchor blocks plain window sills,fillets,sunken floor etc. excluding the cost of centering and shuttering 1:5:10 (one cement : five coarse sand: ten graded stone aggregate 40 mm (forty millimetre nominal size) all work up to plinth leve including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 0.86 | Cubic metre | 3,722.88 | ₹3,201.68 |
| 4 | Making plinth protection 50mm(fifty millimetre) thick of cement concrete 1:3:6 (one cement : Three coarse sand (zone - III) : six graded stone aggregate 20 mm(twenty millimetre) nominal size) over 75mm (seventy five millimetre) thick bed of dry brick ballast 40 mm(forty millimetre) nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 8.6 | Square metre | 494.07 | ₹4,249 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, with design mix M-25 (M-twenty five ) 20 mm (twenty milimeter) nominal size excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level and as per the direction of Engineer-In Charge including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 2.34 | Cubic metre | 6,582.16 | ₹15,402.25 |
| 6 | Reinforced cement concrete work with design mix M-25 (M-twenty five ) 20 mm (twenty milimeter) nominal size in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement and as per the direction of Engineer-In Charge including entire carriage of material in all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1.08 | Cubic metre | 7,760.76 | ₹8,381.62 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15°(fifteen degree) landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with design mix M-20 (M-twenty ) 20 mm (twenty millimetre nominal size) including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1.8 | Cubic metre | 8,210.3 | ₹14,778.54 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 16 | Square metre | 241.65 | ₹3,866.4 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platform including entire carriage of material in all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 7.29 | Square metre | 574.15 | ₹4,185.55 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Columns, piers, abutments, pillars, posts and struts . including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 14.4 | square metre | 612.97 | ₹8,826.77 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.11 MB
SBD7.pdf
Tender Documents • 5.36 MB
corrigendum.pdf
Additional Documents • 0.28 MB
BOQ_214428.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .