GEMC-511687720101808
Awarded to THREE D INTEGRATED SOLUTIONS LIMITED
₹25.8 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |
| Basic Cost for Supply of ASFT | Moventor Oy / Skiddometer | 90248099 | 1 pieces | 12,158,636.03 | 12,158,636.03 |
| Transportation Cost | Three D Integrated Solutions Ltd / ThreeD | 9965 | 1 pieces | 964,179.84 | 964,179.84 |
| Transit Insurance Cost | Three D Integrated Solutions Ltd / ThreeD | 9971 | 1 pieces | 8,511.05 | 8,511.05 |
| Operations Cost for 1st year at the rate of 8.93 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,085,766.2 | 1,085,766.2 |
| Operations Cost for 2nd year at the rate of 9.54 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,159,933.88 | 1,159,933.88 |
| Operation and CAMC Cost for 1st year after warrantee period at the rate of 13.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,615,882.73 | 1,615,882.73 |
| Operation and CAMC Cost for 2nd year after warrantee period at the rate of 14.25 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,732,605.63 | 1,732,605.63 |
| Operation and CAMC Cost for 3rd year after warrantee period at the rate of 15.29 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,859,055.45 | 1,859,055.45 |
| Operation and CAMC Cost for 4th year after warrantee period at the rate of 16.41 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 1,995,232.17 | 1,995,232.17 |
| Operation and CAMC Cost for 5th year after warrantee period at the rate of 17.62 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,142,351.67 | 2,142,351.67 |
| Operation and CAMC Cost for 6th year after warrantee period at the rate of 19.03 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,313,788.44 | 2,313,788.44 |
| Operation and CAMC Cost for 7th year after warrantee period at the rate of 20.55 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,498,599.7 | 2,498,599.7 |
| Operation and CAMC Cost for 8th year after warrantee period at the rate of 22.21 percent of Basic Cost | Three D Integrated Solutions Ltd / ThreeD | 9987 | 1 pieces | 2,700,433.06 | 2,700,433.06 |