Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹33.3 L
EMD Value
₹66,600
Closing Date
31 Dec 2020, 4:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer, Construction Division Jammu, J and K Sports Council
Development of playfield alongwith Balole Nallah Bandurakh District Jammu by way of construction of crated R/wall on down stream side, RCC counterfort wall on upstream side including RBM filling.
2020_SPORT_111629_2
E-17/17 OF 2020-21 Dt. 15-12-2020.
Open Tender
Civil Works
Item Rate
90 days
JAMMU
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Yes
Executive Engineer, JK Sports Council
₹66,600
Yes
Executive Engineer, JK Sports Council Jammu
6 Jan 2021
16 Dec 2020
1 Jan 2021
16 Dec 2020
31 Dec 2020
16 Dec 2020
29 Dec 2020
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil including disposal as per direction of Engineer incharge .
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all lead lift and carraige complete.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement All work upto plinth level. 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) including all lead lift and carraige complete.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement.1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) including all lead lift and carraige complete.
Centring and shuttermg including strutting, propping etc. and removal of form for foundation footing
Centring and shuttermg including strutting, propping etc. and removal of form for walls (any thickness) attched forpilasters, buttresses, plinth and string courses etc.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Cold twisted bars
supply and filling of wire crates including supply of stone and crates including all lead lifts and carraige complete .
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Filling of river bed materials including digging, loading, unloading, carriage royality & consolidation Complete including all lead lift and carraige complete.
Note :- 1) Any Tropical error shall be consider as per sanction schedule of rates/ estimates.
M/S MAHESH KOTWAL CONTRACTOR
CHANDER MOHAN
MOHD IDRIS SHAN
Sudesh Kumar
M/S SURESH CHANDER
KAMAL KISHORE
Ravinder Nath Sharma
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .