Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical MADURAI MADURAI TAMIL NADU | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹60.0 Cr
EMD Value
₹30.1 L
Closing Date
12 Feb 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
Office of the Superintending Engineer, Highways, NABARD and Rural Roads Circle,Opposite to Government workshop, Manakkadu Bus stop, Hasthampatty, Salem - 7
Construction of ROB at Km 1/8 of Namakkal Bypass road Km 0/8-2/2 incl. Railway Portion at Railway Km 47/5-6 in between Kalangani and Namakkal Railway Stations in SA-KRR section in the main work of Forming Bypass to Namakkal town Km 0/8-6/0 (Phase-II)
2025_HWAY_517718_1
TN.No.35 /2024-2025 / SDO/Dated.31.12.2024
Open Tender
Civil Works - Bridges
Item Rate
900 days
Salem
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹30.1 L
Salem
25 Feb 2025
10 Jan 2025
13 Feb 2025
10 Jan 2025
12 Feb 2025
10 Jan 2025
5 Feb 2025
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.47 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_616590.xls
BOQ • 0.39 MB
PQ_Namakkal_PhaseII_ROB.pdf
Tender Documents • 0.46 MB
Drawings_ROB.pdf
Additional Documents • 16.44 MB
BID_Namakkal_ROB_Bypass_PhaseII.pdf
Tender Documents • 5.54 MB
BOQ.xls
BOQ • 0.39 MB
Tenderdocument.pdf
Tender Documents • 16.44 MB
Tenderdocument_2.pdf
Tender Documents • 0.46 MB
Tenderdocument_3.pdf
Tender Documents • 5.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .