Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹2.4 L
Closing Date
31 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER
19 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover The tenderers shall submit requisite information as per Annexure-VIB of GCC (along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Note: Client certificate from other than Govt Organization should be duly supported by Form 16A/26AS generated through TRACES of Income Tax Department of India.
Regarding average annual contractual turnover, the tenderers shall submit Annexure-VI B of GCC as per proforma available in GCC / Tender Document A to C.
62 conditions · 8 needing a document upload
Annexure IX Details of Bank Particulars.
Annexure-III : Constitution of the Firm with required document copies i.e. Joint Venture/ Partnership Deed(s), Incorporation of Company, etc.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The accepted rates should be deemed to include all taxes direct or indirect including Income Tax leviable under Central/State or Local Bodies Act or Rules.
(i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids) (iii) Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
The tenderers shall submit a copy of certificate stating that all their statements/ documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-XIIA or VA of GCC. Non submission of above certificate by the bidder shall result in summarily rejection of his /their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the Tender Document.
Payment towards the EMD (Earnest Money Deposit) as indicated in the NIT header should be paid only through the E-Payment facility (i.e.) Net banking or Payment Gateway provided in the IREPS web portal.
Tenderers shall hold the offer open for acceptance for a minimum period of 60 days from the date of opening of the tender.
If the date of opening of tender is declared a holiday at a later date, the tenders will be opened on the next working day.
GST: It may please be noted that the supplier of Goods and/or services for the said tender/agreement, would be subject to GST Act and rules as applicable from time to time.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act, shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to Railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the Railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in clause-37 of the IRSGCC for the completion of works to the entire satisfaction of the Engineer.
The option of payment through Letter of Credit has been enabled for all tenders whose value is equal to or greater than Rs.10 Lakhs. Necessary instructions/ conditions are incorporated as condition No.67 in the tender document part A to C.
Unreleased EMD, if any, held with the Railway Administration, shall not be adjusted towards the EMD to be remitted.
Discharged instruments towards EMD of other tenders will not be accepted.
Tenderers must upload details of all works on hand with them in Railways, other public sector undertakings and private sector undertakings in the proforma (ANNEXURE-IV) while submitting their offers.
All terms and conditions in the tender documents are binding on the tenderers. Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
The tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum of work. Tenderer should refer for Special Conditons General & Technical, which are attached to the tender document in Documents attached to the tender. These special conditions form part of the tender document and will supplement to the conditions of tender already submitted by the tenderer, IRSGCC along with updated correction slips, IRUSSR. Where are provisions of these special conditions are at variance with IRSGCC and other documents mentioned above, these Special Conditions shall prevail.
Tenderer may please note that offers received without requisite/ mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderers may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderers shall have no claims on this account.
IF THE TENDERER/S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR FIVE YEARS ON ENTIRE IR .
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and the contractor shall further observe and comply with the bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection w ith the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
All documents related to MOU or Joint Venture/Agreement/Consortium should be uploaded at the time of submission of bid as per Form given in Annexure XIV and XV, Form JV-3 & JV-4. Original documents related to above should be submitted to the office of the Chief Administrative Officer, Construction, Southern Railway, E.V.R. High Road, Egmore, Chennai-600 008 within ten working days from the closing date of closing failing which the tender liable to be rejected.
All documents in support of fulfillment of eligibility criteria should be uploaded along with the tender. Tenders without documentary evidence in support of eligibility criteria will be summarily rejected. No post tender correspondence will be permitted and the tender shall be decided based on the documents submitted/attached with the offer only. However Railway reserves the right to verify/seek for any clarification on the documents/credentials already submitted by the tenderer along with the offer.
Railway reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning the reason for any such action. The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft of copy of the Indian Railway Standard General Conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Chief Administrative Officer/Construction/Southern Railway/Egmore/Chennai - 600 008. In submitting his tender it would be deemed that the tenderer has kept himself fully informed of the provision of the IRS General Conditions of Contract including all corrections and Amendments issued up to date and claim that he is not aware of any amendment or correction slip to the IRS GCC shall not be entertained.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
Proposed construction of Limited Use Subway 1x7.00x4.00m with pre-cast RCC box in lieu of LC No. 11 at Km:26/100-200(26/023) in addition to ROB at Km:26/500-600 between Karamadai and Mettupalayam stations. (By air-pushing using temporary girders)
02-DCE-CN-SA-2026
02-DCE-CN-SA-2026
Open
Works - General
9 Months
Salem, Tamil Nadu
₹0
₹2.4 L
31 Mar 2026
9 Mar 2026
17 Mar 2026
41 items across 5 schedules · ₹1,46,33,010.27 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. | — | — | — | — | |
| 1 | All kinds of soils | cum | 305.50 | 211.33 | 64,561.32 |
| 2 | Soft rock (not requiring blasting) | cum | 131.37 | 444.28 | 58,365.06 |
| Centering and shuttering including strutting, propping etc. and removal of form for : | — | — | — | — | |
| 3 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 838.53 | 765.08 | 6,41,542.53 |
| 4 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 100.00 | 74.78 | 7,478 |
| 25mm gap 'in-situ' welding during traffic block and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (ZIRCON WASHED) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Only required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. All other items required shall be supplied by the Contractor. | — | — | — | — | |
| 5 | For 60 Kg - 90 UTS Rail | Each | 10.00 | 5,833.38 | 58,333.8 |
| Providing Caution Watchman at a location where caution order is imposed and ensuring to be on continuous vigil and exhibit necessary hand signals to the trains for their passage over caution spot. Note: 1) Prescribed protection equipment shall be supplied by Railways and the same shall be returned after work is over. 2) If Contractor fails to post watchman at any time during one day, penalty at double the accepted rates will be levied and 3) The watchman nominated by the contractor will be screened for suitability as per Railway norms. | — | — | — | — | |
| 6 | For one shift ( 12 Hrs) | Each | 30.00 | 1,324.83 | 39,744.9 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 7 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 35.24 | 153.04 | 5,393.13 |
| 8 | Drilling holes of 16mm to 22mm dia. on all types of PSC sleepers and fixing the dowels with adhesive of RDSO approved quality for fixing check rails & guard rails, as directed by Engineer in-charge. | Each | 60.00 | 292.68 | 17,560.8 |
| Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. | — | — | — | — | |
| 9 | For day time block working | TRM | 35.24 | 21.05 | 741.8 |
| 10 | Providing Rail Barricading with rails supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres | MT | 10.00 | 1,801.21 | 18,012.1 |
| 11 | Manufacture of flared portion of Guard Rail by cutting and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right. | Set | 1.00 | 4,869 | 4,869 |
| 12 | Providing and fixing of flared portion of guard rails of any rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot. | Set | 1.00 | 4,064.12 | 4,064.12 |
| 13 | Drilling holes 25mm to 40mm dia. with drill twist in the foot of guard rails for fixing guard rails on bridge as directed. | Each | 44.00 | 77.31 | 3,401.64 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 14 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 50.00 | 867.49 | 43,374.5 |
| Schedule total | ₹9,67,442.7 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022uptoACS-10.pdf
ATTACHMENT
SinglePacketPartAtoC.pdf
ATTACHMENT
Additionalinstructionstobidders.pdf
ATTACHMENT
Clarification on submission AnnxV
ATTACHMENT
Contractors-mBook.pdf
ATTACHMENT
Formatforregistersatsite.pdf
ATTACHMENT
ListofLaboratoriesCivilworks.pdf
ATTACHMENT
PPEforsafetyinConstructionsite.pdf
ATTACHMENT
Scopeofwork.pdf
ATTACHMENT
Milestonechart.pdf
ATTACHMENT
GAD TAD for LUS LC11
ATTACHMENT
ClarificationonsubmissionofAnnexure-V.pdf
ATTACHMENT
LUSatLC11KAY-MTPGADTADapproved.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .