| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC MALLAGUNDA | ₹4.1 Cr Quoted ₹4.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.3 Cr+₹12.7 L (3.01%)Rejected-AOC NO 8 109 1 ARASAMARATHU KAADU MUTHUNAICKENPATTI SEMMAN KODAL POST OMALUR TALUK SALEM DISTRICT 636 304 | SALEM | TAMIL NADU | 636304 | ₹4.3 Cr+₹12.7 L (3.01%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAKSHMI CONSTRUCTIONS L1 | KJS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away and carefully stacking materials useful for reuse for any thickness of Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs complete etc., complete complying with standard specification and as directed by the departmental officer. | 168.13 | sqm | 68 ₹11,432.84 Lowest | 70 ₹11,769.1 |
| 2.00 | Dismantling clearing away and carefully stacking materials use for reuse for any thickness of brick/stone masonry in cement mortar walls under 3 m height etc complete complying with standard specification and as directed by the departmental officersl. | 5.29 | cum | 314 ₹1,661.06 Lowest | 324 ₹1,713.96 |
| 3.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Plain cement concrete and roughening the surface etc., complete complying with standard specification and as directed by the departmental officer. | 17.81 | sqm | 540 ₹9,617.4 Lowest | 557 ₹9,920.17 |
| 4.00 | Dismantling clearing away and carefully stacking materials use for reuse for any thickness of Doors & windows including removal of frames, hinges and fastenings in cement mortar walls under 3 m height etc complete complying with standard specification and as directed by the departmental officersl. | 9.35 | cum | 170 ₹1,589.5 Lowest | 176 ₹1,645.6 |
| 5.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 64.66 | cum | 269 ₹17,393.54 Lowest | 277 ₹17,910.82 |
| 6.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 190.5 | cum | 206 ₹39,243 Lowest | 213 ₹40,576.5 |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete c complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 38.49 | cum | 5,728 ₹2,20,470.72 Lowest | 5,907 ₹2,27,360.43 |
| 8.00 | Supplying and filling of 40mm HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification.. | 2.5 | cum | 1,683 ₹4,207.5 Lowest | 1,735 ₹4,337.5 |
| 9.00 | Supplying and filling of 25mm HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification. | 2.5 | cum | 1,483 ₹3,707.5 Lowest | 1,530 ₹3,825 |
| 10.00 | Supplying and filling of 20mm HBGS metal in dispersion trench around the stoneware pipe or in the leach pit or rain water harvesting pit or soak pit to the required thickness complete complying with standard specification and as directed by the departmental officers. (The rate including cost of metal filling etc. complete complying with standard specification. | 2.5 | cum | 2,237 ₹5,592.5 Lowest | 2,307 ₹5,767.5 |
Tender Value
₹4.1 Cr
EMD Value
₹2.1 L
Closing Date
29 Sept 2025, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, Sardar Patel Road, Dote Campus, Chennai 25
Cons. of differently abled person toilets, Installation of 7 Nos.13 persons capacity Lift in Pride, Old Science, MBA, Physics, Amenity, Arts and COE buildings and Gents , ladies toilet in II floor for COE building in Periyar University campus, Salem
2025_HE_605252_1
PeriyarUniSalem_2025
Open Tender
Civil Works - Buildings
Lump-sum
270 days
Salem
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹2.1 L
Yes
18 Nov 2025
17 Sept 2025
30 Sept 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .